A platform for research: civil engineering, architecture and urbanism
Morrow Point dam is Burec first
Dam on Gunnison River in southwestern Colorado will be Bureau of Reclamation's first double-curvature, thin-arch dam and will have Bureau's first free-fall spillway and underground power house; dam will be part of Colorado River Storage Project; details of construction, beginning 1964, scheduled for completion Dec 1966 for dam and contraction joint grouting, and June 1967 for overall project.
Morrow Point dam is Burec first
Dam on Gunnison River in southwestern Colorado will be Bureau of Reclamation's first double-curvature, thin-arch dam and will have Bureau's first free-fall spillway and underground power house; dam will be part of Colorado River Storage Project; details of construction, beginning 1964, scheduled for completion Dec 1966 for dam and contraction joint grouting, and June 1967 for overall project.
Morrow Point dam is Burec first
Eng News -- Rec
Engineering News-Record ; 173
1964
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1968
|Morrow point underground powerplant
Engineering Index Backfile | 1965
|Construction starts at Morrow point
Engineering Index Backfile | 1963
|Seismic Analysis of Morrow Point Dam
NTIS | 2002
|Hydraulic Model Studies for Morrow Point Dam
NTIS | 1967
|