A platform for research: civil engineering, architecture and urbanism
Methods and results of test borings; preparation of relief map models of strata encountered; study of groundwater conditions and of movement of monuments set in lock site, for period of 1927 to 1930; drainage of lock site by pumping; chemical analysis of groundwater. (See also - no. 27 June 19, 1931, pp. 411-415)
Methods and results of test borings; preparation of relief map models of strata encountered; study of groundwater conditions and of movement of monuments set in lock site, for period of 1927 to 1930; drainage of lock site by pumping; chemical analysis of groundwater. (See also - no. 27 June 19, 1931, pp. 411-415)
Foundation and drainage tests preliminary to construction of northern locks at bremerhaven
Die Untersuchung des Baugrundes und die Wasserhaltung fuer den Bau der Nordschleusenanlage in Bremerhaven
Otto, W. (author)
Bautechnik ; 9
1931
7 pages
25 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting plant in construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Geological information from soil tests preliminary to construction of north locks of bremerhaven
Engineering Index Backfile | 1931
|Construction of northern canal locks at Bremerhaven. Excavation and driving of piling
Engineering Index Backfile | 1931
|Sliding gates and bypath sluices of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Principles of design and construction of north locks in Bremerhaven
Engineering Index Backfile | 1930
|