A platform for research: civil engineering, architecture and urbanism
Development of urban transportation system of Chicago; construction of State Street Subway, 3 1/2 mi long, including 1290 ft of tunnels and 210 ft of river tubes; design specifications; river crossings; ramps; subway stations; architectural treatment; ventilation; illumination; drainage; track work; sewers; backfill; estimated cost $44,500,000; assessment proceedings. (See also - (discussion) p 115-8; Gen Contractors Assn -- Bul v 23 n 11 Nov 1932 p 245-50)
Development of urban transportation system of Chicago; construction of State Street Subway, 3 1/2 mi long, including 1290 ft of tunnels and 210 ft of river tubes; design specifications; river crossings; ramps; subway stations; architectural treatment; ventilation; illumination; drainage; track work; sewers; backfill; estimated cost $44,500,000; assessment proceedings. (See also - (discussion) p 115-8; Gen Contractors Assn -- Bul v 23 n 11 Nov 1932 p 245-50)
State street subway of city of Chicago
Mun Engrs J
Brahdy, A. (author)
1932
29 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
State street subway of city of Chicago
Engineering Index Backfile | 1932
|Chicago subway station street decking
Engineering Index Backfile | 1942
Chicago extends subway under La Salle street station
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1939
|