A platform for research: civil engineering, architecture and urbanism
Prefabricated reinforcing steel for tunnel lining
Illustrated description of construction of 48-in. water pipe line in Newark, NJ; at one point it passes under three tracks of Erie Railroad; it was decided to drive tunnel under tracks, using pressed steel line plates; prefabricated 5-ft sections of reinforcing steel could be moved as unit into tunnel; welding and other operations described. From paper in competition of James F. Lincoln Arc Welding Foundation.
Prefabricated reinforcing steel for tunnel lining
Illustrated description of construction of 48-in. water pipe line in Newark, NJ; at one point it passes under three tracks of Erie Railroad; it was decided to drive tunnel under tracks, using pressed steel line plates; prefabricated 5-ft sections of reinforcing steel could be moved as unit into tunnel; welding and other operations described. From paper in competition of James F. Lincoln Arc Welding Foundation.
Prefabricated reinforcing steel for tunnel lining
Civ Eng (NY)
Leedom, L.M. (author)
1943
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Arched tunnel lining reinforcing steel bar component forming method
European Patent Office | 2024
|Construction method for tunnel gridding prefabricated slab lining
European Patent Office | 2023
|Prefabricated assembled lining structure for open cut tunnel and lining construction method
European Patent Office | 2024
|The shape stability of reinforcing steel arch support in shotcrete tunnel lining
British Library Conference Proceedings | 2000
|