A platform for research: civil engineering, architecture and urbanism
Fitting-out dock at deck level
Latest developments in shipyard design and maximum use of prefabrication methods are features of Marinship, 6-way yard built under high speed construction program at Sausalito, Calif; brief description of yard.
Fitting-out dock at deck level
Latest developments in shipyard design and maximum use of prefabrication methods are features of Marinship, 6-way yard built under high speed construction program at Sausalito, Calif; brief description of yard.
Fitting-out dock at deck level
Shipbldg Shipg Rec
1943
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Shipyard adopts deck-high outfitting dock
Engineering Index Backfile | 1943
DECK MATERIAL INSTALLATION METAL FITTING AND DECK MATERIAL FITTING STRUCTURE
European Patent Office | 2016
|DECK MATERIAL INSTALLATION METAL FITTING AND DECK MATERIAL FITTING STRUCTURE
European Patent Office | 2016
|