A platform for research: civil engineering, architecture and urbanism
Second stage of neath by-pass
Scheme provides for twin 22 ft roadways separated by 8 ft wide reserve; footpath 6 ft wide will be constructed; 300,000 cu yd excavated from cuttings and foundations and consolidated embankments required some 500,000 cu yd; there are seven bridges in scheme; 22 ft span reinforced concrete bridge for vehicles and pedestrians constructed.
Second stage of neath by-pass
Scheme provides for twin 22 ft roadways separated by 8 ft wide reserve; footpath 6 ft wide will be constructed; 300,000 cu yd excavated from cuttings and foundations and consolidated embankments required some 500,000 cu yd; there are seven bridges in scheme; 22 ft span reinforced concrete bridge for vehicles and pedestrians constructed.
Second stage of neath by-pass
Civ Structural Engrs Rev
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
Opening of Neath by-pass bridge and viaduct
Engineering Index Backfile | 1955
Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|