A platform for research: civil engineering, architecture and urbanism
Progress of Neath by-pass
Project which is part of London to Fishguard Trunk Road, includes viaduct of 16 spans with total length of 1610 ft, and high level bridge of 300 ft clear span over River Neath; bridge and viaduct being built of steel plate girders supported on reinforced concrete piers.
Progress of Neath by-pass
Project which is part of London to Fishguard Trunk Road, includes viaduct of 16 spans with total length of 1610 ft, and high level bridge of 300 ft clear span over River Neath; bridge and viaduct being built of steel plate girders supported on reinforced concrete piers.
Progress of Neath by-pass
Engineer
Engineer ; 191
1951
2 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Opening of Neath by-pass bridge and viaduct
Engineering Index Backfile | 1955
Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|