A platform for research: civil engineering, architecture and urbanism
Opening of Neath by-pass bridge and viaduct
High level 3/4-mi road formed by two steel viaducts; one 972 ft long with 11 spans, other 1610 ft long with 17 spans; River Neath crossing in center of longer viaduct comprises 3-span bridge which gives clearance of 90 ft above high water level; steel members of viaduct superstructures are riveted.
Opening of Neath by-pass bridge and viaduct
High level 3/4-mi road formed by two steel viaducts; one 972 ft long with 11 spans, other 1610 ft long with 17 spans; River Neath crossing in center of longer viaduct comprises 3-span bridge which gives clearance of 90 ft above high water level; steel members of viaduct superstructures are riveted.
Opening of Neath by-pass bridge and viaduct
Engineer
Engineer ; 200
1955
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
Engineering Index Backfile | 1957
Bridge over River Neath: Bridging the M4's `missing link'
British Library Online Contents | 1995
|Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|Design of Neath and Briton Ferry viaducts
Engineering Index Backfile | 1957
|