A platform for research: civil engineering, architecture and urbanism
Recently-built road bridge in prestressed concrete
Reconstruction of Ynysygwas bridge across Afan River in South Wales; bridge having clear span of 60 ft with 2 ft bearing, comprises 11 64-ft long precast posttensioned prestressed concrete girders and 16 precast footway slabs; bridge carries 16-ft roadway and 6-ft footpath on each side.
Recently-built road bridge in prestressed concrete
Reconstruction of Ynysygwas bridge across Afan River in South Wales; bridge having clear span of 60 ft with 2 ft bearing, comprises 11 64-ft long precast posttensioned prestressed concrete girders and 16 precast footway slabs; bridge carries 16-ft roadway and 6-ft footpath on each side.
Recently-built road bridge in prestressed concrete
Civ Eng (Lond)
Kaylor, H. (author)
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed concrete road bridge
Engineering Index Backfile | 1957
|Prestressed-concrete road bridge at Abertillery
Engineering Index Backfile | 1952
Prestressed concrete road bridge in Yugoslavia
Engineering Index Backfile | 1962
|Road bridge in partially prestressed concrete
Engineering Index Backfile | 1962
|Pretensioned units for prestressed concrete bridge built on job
Engineering Index Backfile | 1952