A platform for research: civil engineering, architecture and urbanism
Design and construction details behind modernized distribution system engineered to combine economy of installation and power-plus capacity for full and flexible use of heavy duty electric appliances throughout Tudor Hall, large apartment house in Englewood, NJ.
Design and construction details behind modernized distribution system engineered to combine economy of installation and power-plus capacity for full and flexible use of heavy duty electric appliances throughout Tudor Hall, large apartment house in Englewood, NJ.
Apartment house rewiring
Elec Construction Maintenance
Reichel, A.N. (author)
1956
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.