A platform for research: civil engineering, architecture and urbanism
The engineering design of the Royal Tweed bridge
Northern span 361 ft. 6 in.; other spans decreasing respectively to 285 ft., 248 ft., and 167 ft., following fall of road level; total length of bridge 1405 ft., including southern approach viaduct and northern approach viaduct; width is 46 ft. between parapets; dimensions of arch ribs. See also succeeding article pp. 309-312, G. F. Palmer, on general procedure and temporary staging in building bridge.
The engineering design of the Royal Tweed bridge
Northern span 361 ft. 6 in.; other spans decreasing respectively to 285 ft., 248 ft., and 167 ft., following fall of road level; total length of bridge 1405 ft., including southern approach viaduct and northern approach viaduct; width is 46 ft. between parapets; dimensions of arch ribs. See also succeeding article pp. 309-312, G. F. Palmer, on general procedure and temporary staging in building bridge.
The engineering design of the Royal Tweed bridge
Ferro-Concrete
Gueritte, T.J. (author)
Ferro-Concrete ; 19
1928
6 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Completion of the Royal Tweed bridge
Engineering Index Backfile | 1925
Completion of the Royal Tweed bridge
Engineering Index Backfile | 1928
Engineering Index Backfile | 1928
The dynamic response of the Berwick-upon-Tweed bypass bridge
Tema Archive | 2008
|