A platform for research: civil engineering, architecture and urbanism
Completion of the Royal Tweed bridge
Concrete structure replaces 17th century bridge at Berwick; longest reinforced-concrete bridge; arched ribs are hollow for about one-third of their span from each springing and solid over crown, except in case of 167-ft. span; traffic impediments removed; supply of materials. (see also description in Engineer, vol. 145, no. 3775, May 18, 1925, pp. 542-543, 1 fig)
Completion of the Royal Tweed bridge
Concrete structure replaces 17th century bridge at Berwick; longest reinforced-concrete bridge; arched ribs are hollow for about one-third of their span from each springing and solid over crown, except in case of 167-ft. span; traffic impediments removed; supply of materials. (see also description in Engineer, vol. 145, no. 3775, May 18, 1925, pp. 542-543, 1 fig)
Completion of the Royal Tweed bridge
Modern Transport
Modern Transport ; 19
1928
2 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Completion of the Royal Tweed bridge
Engineering Index Backfile | 1925
Engineering Index Backfile | 1928
|The engineering design of the Royal Tweed bridge
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1928
The dynamic response of the Berwick-upon-Tweed bypass bridge
Tema Archive | 2008
|