A platform for research: civil engineering, architecture and urbanism
Difficult work on highway fill in muck-bottom lake
Report on building 1600-ft. fill on 5 to 25 ft. of soft muck under water 5 to 10 ft. deep and underlaid by clay and lignite coal in replacing trestle approaches to 125-ft. swing bridge of highway crossing Upper des Lacs Lake near Bowbells, N. D.; placing and settling of material; muck forced up like island; mattress and rock revetment.
Difficult work on highway fill in muck-bottom lake
Report on building 1600-ft. fill on 5 to 25 ft. of soft muck under water 5 to 10 ft. deep and underlaid by clay and lignite coal in replacing trestle approaches to 125-ft. swing bridge of highway crossing Upper des Lacs Lake near Bowbells, N. D.; placing and settling of material; muck forced up like island; mattress and rock revetment.
Difficult work on highway fill in muck-bottom lake
Eng. News-Rec
Engineering News-Record ; 105
1930
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Muck dredged out, solid fill pumped
Engineering Index Backfile | 1941
|Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Ash fill on muck base makes airport
Engineering Index Backfile | 1938
Stabilization by drainage of Muck and Sand Fill
Engineering Index Backfile | 1932
|Lake-bottom dirt makes runway fill
Engineering Index Backfile | 1961