Construction method used for underground space below existing road
The invention relates to a construction method used for an underground space below an existing road. The method comprises the following steps that a construction area is determined; pile holes are dugin the road surface within the construction area; pile foundations are driven into every pile hole in sequence; the road surface within the construction area is disassembled; prefabricated slabs arelaid in the construction area and are fixedly connected with the pile foundations; fillers in the area formed by the pile foundations and the prefabricated slabs are removed; load bearing walls, floors and roofs are fabricated based on the pile foundations; and the road surface is repaired based on the prefabricated slabs. The construction method is used for construction of the underground space in cities, and the holding time of the construction process to the ground can be shortened as much as possible.
本发明涉及一种用于现有道路下方地下空间的施工方法,包括以下步骤:确定施工区域;在施工区域内的路面上挖设桩孔;将桩基顺序打入到每一个桩孔内;拆除施工区域内的路面;在施工区域内铺设预制板并将预制板与桩基固定连接;去除桩基与预制板围拢区域内的填充物;以桩基为基础制作承重墙、地面和屋顶;以及以预制板为基础对路面进行修复。本发明用于城市中地下空间的建造,能够尽可能的减少施工过程对地面的占用时间。
Construction method used for underground space below existing road
The invention relates to a construction method used for an underground space below an existing road. The method comprises the following steps that a construction area is determined; pile holes are dugin the road surface within the construction area; pile foundations are driven into every pile hole in sequence; the road surface within the construction area is disassembled; prefabricated slabs arelaid in the construction area and are fixedly connected with the pile foundations; fillers in the area formed by the pile foundations and the prefabricated slabs are removed; load bearing walls, floors and roofs are fabricated based on the pile foundations; and the road surface is repaired based on the prefabricated slabs. The construction method is used for construction of the underground space in cities, and the holding time of the construction process to the ground can be shortened as much as possible.
本发明涉及一种用于现有道路下方地下空间的施工方法,包括以下步骤:确定施工区域;在施工区域内的路面上挖设桩孔;将桩基顺序打入到每一个桩孔内;拆除施工区域内的路面;在施工区域内铺设预制板并将预制板与桩基固定连接;去除桩基与预制板围拢区域内的填充物;以桩基为基础制作承重墙、地面和屋顶;以及以预制板为基础对路面进行修复。本发明用于城市中地下空间的建造,能够尽可能的减少施工过程对地面的占用时间。
Construction method used for underground space below existing road
一种用于现有道路下方地下空间的施工方法
LI WENGANG (author) / LIU BING (author) / LI PAN (author) / LIU XINZE (author) / LI JIUJIANG (author) / BIAN MANXI (author) / ZHANG YU (author) / ZHAO JINGRUI (author) / DU CHANGSHENG (author)
2020-07-03
Patent
Electronic Resource
Chinese
Construction method for newly building underground space below existing pier
European Patent Office | 2021
|Existing underground space structure toughening device and construction method
European Patent Office | 2022
|European Patent Office | 2023
|Underground structure construction method using existing underground diaphragm wall
European Patent Office | 2024
|