High-stability kerb and construction method thereof
The invention discloses a high-stability kerb and a construction method thereof, and relates to the technical field of road construction. According to the technical scheme, the high-stability kerb comprises a kerb body, the kerb body comprises a kerb top wall and a kerb bottom wall, a side wall of the kerb body comprises a fixing wall used for being fixed to a sidewalk, a top hole is formed in thekerb top wall, a side hole is formed in the fixing wall, and the side hole is connected with the top hole; and a first pipe is arranged in the top hole in a penetrating mode, a second pipe is arranged in the side hole in a penetrating mode, the inner portions of the first pipe and the second pipe are connected to form an injection channel, and two ends of the injection channel are an orifice of the top hole and the orifice of the side hole respectively. In the invention, cement mortar can enter the bottom of a contact part of the sidewalk and the kerb more easily so that the kerb is mounted more stably; the installation stability of the kerb is further improved through inserting of the bottom of the first pipe and an installation hole and fixing of cement; and the first pipe and the second pipe form a skeleton structure in the kerb body so that impact resistance of the kerb is improved.
本发明公开了一种高稳定路缘石及其施工方法,涉及道路施工技术领域,其技术方案要点是:高稳定路缘石包括石本体,所述石本体包括石顶壁和石底壁,所述石本体的侧壁包括用于与人行道固定的固定壁,所述石顶壁开设有顶孔,所述固定壁开设有侧孔,所述侧孔连通顶孔;所述顶孔内穿设有管一,所述侧孔穿设有管二,所述管一、管二内部连通形成注入通道,所述注入通道的两端分别为顶孔的孔口、侧孔的孔口。通过本发明,水泥砂浆更易进入人行道、路缘石接触部位的底部,使路缘石的安装更为稳固;通过管一底部与安装孔的插接以及水泥固定,进一步提升了路缘石的安装稳固性;管一、管二在石本体内形成骨架结构,提高了路缘石的耐冲击性。
High-stability kerb and construction method thereof
The invention discloses a high-stability kerb and a construction method thereof, and relates to the technical field of road construction. According to the technical scheme, the high-stability kerb comprises a kerb body, the kerb body comprises a kerb top wall and a kerb bottom wall, a side wall of the kerb body comprises a fixing wall used for being fixed to a sidewalk, a top hole is formed in thekerb top wall, a side hole is formed in the fixing wall, and the side hole is connected with the top hole; and a first pipe is arranged in the top hole in a penetrating mode, a second pipe is arranged in the side hole in a penetrating mode, the inner portions of the first pipe and the second pipe are connected to form an injection channel, and two ends of the injection channel are an orifice of the top hole and the orifice of the side hole respectively. In the invention, cement mortar can enter the bottom of a contact part of the sidewalk and the kerb more easily so that the kerb is mounted more stably; the installation stability of the kerb is further improved through inserting of the bottom of the first pipe and an installation hole and fixing of cement; and the first pipe and the second pipe form a skeleton structure in the kerb body so that impact resistance of the kerb is improved.
本发明公开了一种高稳定路缘石及其施工方法,涉及道路施工技术领域,其技术方案要点是:高稳定路缘石包括石本体,所述石本体包括石顶壁和石底壁,所述石本体的侧壁包括用于与人行道固定的固定壁,所述石顶壁开设有顶孔,所述固定壁开设有侧孔,所述侧孔连通顶孔;所述顶孔内穿设有管一,所述侧孔穿设有管二,所述管一、管二内部连通形成注入通道,所述注入通道的两端分别为顶孔的孔口、侧孔的孔口。通过本发明,水泥砂浆更易进入人行道、路缘石接触部位的底部,使路缘石的安装更为稳固;通过管一底部与安装孔的插接以及水泥固定,进一步提升了路缘石的安装稳固性;管一、管二在石本体内形成骨架结构,提高了路缘石的耐冲击性。
High-stability kerb and construction method thereof
高稳定路缘石及其施工方法
SHAO YANGJIE (author) / HU LINGYUN (author)
2020-09-29
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
PREFABRICATED FORM FOR KERB CONSTRUCTION AND CONSTRUCTION METHOD OF KERB USING THE SAME
European Patent Office | 2018
|Municipal kerb construction method and use method thereof
European Patent Office | 2021
|Water blocking type kerb and construction method thereof
European Patent Office | 2015
|