A platform for research: civil engineering, architecture and urbanism
The invention discloses a combined integrated ceiling joist. The combined integrated ceiling joist comprises a horizontal main plate on a triangular joist. Arc first folded plates are formed on the two side edges of the main plate. Arc first transition plates are formed on the other side edges of the first folded plates, first inclined plates are formed on the other side edges of the first transition plates, multiple slots are formed in the two sides of the main plate, and elastic reinforcing parts are inserted into the slots of the main plate. The elastic reinforcing parts comprise arc secondfolded plates distributed in the slots of the main plate, inclined inserting plates are formed on the upper side edges of the second folded plates, the inserting plates abut against the lower end face of the main plate, arc second transition plates are formed on the lower side edges of the second folded plates, second inclined plates are formed in the lower side edges of the second transition plates, and the second inclined plates abut against the first inclined plates. Pin shafts are inserted into the second folded plates of the elastic reinforcing parts, shaft sleeves are inserted into thetwo ends of the pin shafts in a sleeved manner, and the shaft sleeves are inserted into the first folded plates.
本发明公开了一种组合式的集成吊顶龙骨,包括三角龙骨上水平的主板,主板的两侧边成型有圆弧形的第一折板,第一折板的另一侧边成型有圆弧形的第一过渡板,第一过渡板的另一侧边成型有第一斜板,主板的两侧成型有若干个插槽,主板的插槽内插接有弹性加强件,弹性加强件包括分布在主板插槽内的圆弧形的第二折板,第二折板的上侧边成型有倾斜的插板,插板压靠在主板的下端面上,第二折板的下侧边成型有圆弧形的第二过渡板,第二过渡板的下侧边成型有第二斜板,第二斜板压靠在第一斜板上;弹性加强件的第二折板内插接有销轴,销轴的两端插套有轴套,轴套插接在第一折板内。
The invention discloses a combined integrated ceiling joist. The combined integrated ceiling joist comprises a horizontal main plate on a triangular joist. Arc first folded plates are formed on the two side edges of the main plate. Arc first transition plates are formed on the other side edges of the first folded plates, first inclined plates are formed on the other side edges of the first transition plates, multiple slots are formed in the two sides of the main plate, and elastic reinforcing parts are inserted into the slots of the main plate. The elastic reinforcing parts comprise arc secondfolded plates distributed in the slots of the main plate, inclined inserting plates are formed on the upper side edges of the second folded plates, the inserting plates abut against the lower end face of the main plate, arc second transition plates are formed on the lower side edges of the second folded plates, second inclined plates are formed in the lower side edges of the second transition plates, and the second inclined plates abut against the first inclined plates. Pin shafts are inserted into the second folded plates of the elastic reinforcing parts, shaft sleeves are inserted into thetwo ends of the pin shafts in a sleeved manner, and the shaft sleeves are inserted into the first folded plates.
本发明公开了一种组合式的集成吊顶龙骨,包括三角龙骨上水平的主板,主板的两侧边成型有圆弧形的第一折板,第一折板的另一侧边成型有圆弧形的第一过渡板,第一过渡板的另一侧边成型有第一斜板,主板的两侧成型有若干个插槽,主板的插槽内插接有弹性加强件,弹性加强件包括分布在主板插槽内的圆弧形的第二折板,第二折板的上侧边成型有倾斜的插板,插板压靠在主板的下端面上,第二折板的下侧边成型有圆弧形的第二过渡板,第二过渡板的下侧边成型有第二斜板,第二斜板压靠在第一斜板上;弹性加强件的第二折板内插接有销轴,销轴的两端插套有轴套,轴套插接在第一折板内。
MOUNTING STRUCTURE OF CEILING JOIST, AND CEILING JOIST MOUNTING METAL FITTING
European Patent Office | 2020
|CEILING JOIST INSTALLATION METAL FITTING, AND SEISMIC REINFORCEMENT STRUCTURE FOR CEILING JOIST
European Patent Office | 2017
|