A platform for research: civil engineering, architecture and urbanism
Demonstration device for simulating necking and construction treatment process of immersed tube cast-in-place pile
The application provides a demonstration device for simulating a necking and construction treatment process of an immersed tube cast-in-place pile, and belongs to the technical field of tests of foundations or foundation structures of hydraulic engineering and the like. The device comprises a demonstration platform mechanism, a foundation soil layer distribution simulation mechanism, a heating mechanism, a pouring model mechanism, a forming pile model mechanism, a mixing box mechanism, a pouring appliance mechanism and a bearing capacity detection mechanism. The device is applied to demonstration of the necking and reinforcing effects of the immersed tube cast-in-place pile, can visually display the necking and reinforcing effects of immersed tube cast-in-place, and has the advantages of being safe, attractive, environmentally friendly, capable of achieving static and dynamic combined demonstration, high in reduction degree and integration degree and the like.
本申请提供一种模拟沉管灌注桩缩颈与施工处理过程的演示装置,属于水利工程等基础或基础结构的试验技术领域。包括演示台机构、地基土层分布模拟机构、加热机构、灌注模型机构、成形桩模型机构、拌合盒机构、灌注器具机构、承载力检测机构。将本申请应用于沉管灌注桩缩颈与加固效果的演示,可直观显示沉管灌注的缩颈与加固效果,具有安全美观、绿色环保、可实现静动态结合演示、还原度与一体化程度高等优点。
Demonstration device for simulating necking and construction treatment process of immersed tube cast-in-place pile
The application provides a demonstration device for simulating a necking and construction treatment process of an immersed tube cast-in-place pile, and belongs to the technical field of tests of foundations or foundation structures of hydraulic engineering and the like. The device comprises a demonstration platform mechanism, a foundation soil layer distribution simulation mechanism, a heating mechanism, a pouring model mechanism, a forming pile model mechanism, a mixing box mechanism, a pouring appliance mechanism and a bearing capacity detection mechanism. The device is applied to demonstration of the necking and reinforcing effects of the immersed tube cast-in-place pile, can visually display the necking and reinforcing effects of immersed tube cast-in-place, and has the advantages of being safe, attractive, environmentally friendly, capable of achieving static and dynamic combined demonstration, high in reduction degree and integration degree and the like.
本申请提供一种模拟沉管灌注桩缩颈与施工处理过程的演示装置,属于水利工程等基础或基础结构的试验技术领域。包括演示台机构、地基土层分布模拟机构、加热机构、灌注模型机构、成形桩模型机构、拌合盒机构、灌注器具机构、承载力检测机构。将本申请应用于沉管灌注桩缩颈与加固效果的演示,可直观显示沉管灌注的缩颈与加固效果,具有安全美观、绿色环保、可实现静动态结合演示、还原度与一体化程度高等优点。
Demonstration device for simulating necking and construction treatment process of immersed tube cast-in-place pile
一种模拟沉管灌注桩缩颈与施工处理过程的演示装置
LI NA (author) / WANG WEI (author) / KANG HAIBO (author) / DAI MENGDAN (author) / ZHANG FANG (author) / JIANG PING (author)
2020-10-30
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|European Patent Office | 2020
|Cast-in-place pile immersed tube and cast-in-place pile construction method
European Patent Office | 2021
|European Patent Office | 2020
|Immersed tube compaction pile or cast-in-place concrete pile construction device and method
European Patent Office | 2015
|