A platform for research: civil engineering, architecture and urbanism
Demonstration device for pile breaking and construction treatment processes of immersed tube cast-in-place pile
The application provides a demonstration device for a pile breaking and construction treatment process of an immersed tube cast-in-place pile, and belongs to the technical field of tests of foundations or foundation structures of hydraulic engineering and the like. The device comprises a demonstration platform mechanism, a foundation simulation mechanism, a pile model arrangement mechanism, a magnetomotive mechanism, a telescopic rod mechanism, a pouring appliance mechanism, a pouring slurry mixing mechanism and a bearing capacity testing mechanism. The device is applied to demonstration of the pile breaking and reinforcing effect of the immersed tube cast-in-place pile, the pile breaking and reinforcing effect of immersed tube cast-in-place can be visually displayed, and the device has the advantages of being safe, attractive, high in portability, close to teaching, easy to operate, environmentally friendly, multipurpose, visual, high in simulation degree and the like.
本申请提供一种沉管灌注桩断桩与施工处理过程的演示装置,属于水利工程等基础或基础结构的试验技术领域。包括演示台机构、地基模拟机构、桩模型布置机构、磁动力机构、伸缩杆机构、灌注器具机构、灌注浆拌合机构和承载力测试机构。将本申请应用于沉管灌注桩断桩与加固效果的演示,可直观显示沉管灌注的断桩与加固效果,具有安全美观、便携性强、贴近教学、操作简单、绿色环保以及多用性、可视化和模拟度高等优点。
Demonstration device for pile breaking and construction treatment processes of immersed tube cast-in-place pile
The application provides a demonstration device for a pile breaking and construction treatment process of an immersed tube cast-in-place pile, and belongs to the technical field of tests of foundations or foundation structures of hydraulic engineering and the like. The device comprises a demonstration platform mechanism, a foundation simulation mechanism, a pile model arrangement mechanism, a magnetomotive mechanism, a telescopic rod mechanism, a pouring appliance mechanism, a pouring slurry mixing mechanism and a bearing capacity testing mechanism. The device is applied to demonstration of the pile breaking and reinforcing effect of the immersed tube cast-in-place pile, the pile breaking and reinforcing effect of immersed tube cast-in-place can be visually displayed, and the device has the advantages of being safe, attractive, high in portability, close to teaching, easy to operate, environmentally friendly, multipurpose, visual, high in simulation degree and the like.
本申请提供一种沉管灌注桩断桩与施工处理过程的演示装置,属于水利工程等基础或基础结构的试验技术领域。包括演示台机构、地基模拟机构、桩模型布置机构、磁动力机构、伸缩杆机构、灌注器具机构、灌注浆拌合机构和承载力测试机构。将本申请应用于沉管灌注桩断桩与加固效果的演示,可直观显示沉管灌注的断桩与加固效果,具有安全美观、便携性强、贴近教学、操作简单、绿色环保以及多用性、可视化和模拟度高等优点。
Demonstration device for pile breaking and construction treatment processes of immersed tube cast-in-place pile
一种沉管灌注桩断桩与施工处理过程的演示装置
ZHANG FANG (author) / KANG HAIBO (author) / WANG WEI (author) / QIAN BIAO (author) / FANG RUI (author)
2020-10-30
Patent
Electronic Resource
Chinese
Cast-in-place pile immersed tube and cast-in-place pile construction method
European Patent Office | 2021
|European Patent Office | 2020
|Immersed tube compaction pile or cast-in-place concrete pile construction device and method
European Patent Office | 2015
|European Patent Office | 2020
|European Patent Office | 2024
|