A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of athletic field materials, and particularly relates to a preparation method of a pouring type prefabricated polyurethane elastomer athletic field material. A casting machine comprises a base and a storage box. A storage box is fixedly connected to the upper surface of the left side of the base; a conveying belt is rotationally connected into the storage box through a motor; a long groove is formed in the inner wall of the storage box on the right side of the conveying belt and penetrates through the inner wall of the right side of the storage box;and a mounting groove is formed in the inner wall of the base on the right side of the storage box. According to the invention, the manufacturing method is mainly used for solving the problems that in the existing sports field material pouring process, due to accumulation of raw materials, the thicknesses of manufactured sports field materials are different; meanwhile, in the sports field material manufacturing process, a water-based adhesive solution is added, so that the product solves the problem that in the raw material pouring process, the raw materials are liable to be bonded and accumulated, the thickness of each part of raw materials is not uniform in the pouring process of the raw materials, and thereby the manufactured sport field materials are uneven.
本发明属于运动场地材料技术领域,具体的说是一种浇注型预制聚氨酯弹性体运动场地材料制备方法,所述浇注机包括底座和储物箱;所述底座左侧上表面固连有储物箱;所述储物箱内通过马达转动连接有输送带;所述输送带右侧于储物箱内壁中开设有长槽,且长槽贯穿储物箱右侧内壁设计;所述储物箱右侧于底座内壁中开设有安装槽;本发明主要用于解决目前在对运动场地材料进行浇注的过程中,由于原料之间产生堆积,从而导致制作的运动场地材料厚度有所差异,同时本发明在制作运动场地材料时添加的水性胶溶液,在原料浇注的过程中原料会发生粘接产生堆积,导致原料在浇注的过程中各部分原料厚度不均匀,从而会使制作的运动场地材料凹凸不平的问题。
The invention belongs to the technical field of athletic field materials, and particularly relates to a preparation method of a pouring type prefabricated polyurethane elastomer athletic field material. A casting machine comprises a base and a storage box. A storage box is fixedly connected to the upper surface of the left side of the base; a conveying belt is rotationally connected into the storage box through a motor; a long groove is formed in the inner wall of the storage box on the right side of the conveying belt and penetrates through the inner wall of the right side of the storage box;and a mounting groove is formed in the inner wall of the base on the right side of the storage box. According to the invention, the manufacturing method is mainly used for solving the problems that in the existing sports field material pouring process, due to accumulation of raw materials, the thicknesses of manufactured sports field materials are different; meanwhile, in the sports field material manufacturing process, a water-based adhesive solution is added, so that the product solves the problem that in the raw material pouring process, the raw materials are liable to be bonded and accumulated, the thickness of each part of raw materials is not uniform in the pouring process of the raw materials, and thereby the manufactured sport field materials are uneven.
本发明属于运动场地材料技术领域,具体的说是一种浇注型预制聚氨酯弹性体运动场地材料制备方法,所述浇注机包括底座和储物箱;所述底座左侧上表面固连有储物箱;所述储物箱内通过马达转动连接有输送带;所述输送带右侧于储物箱内壁中开设有长槽,且长槽贯穿储物箱右侧内壁设计;所述储物箱右侧于底座内壁中开设有安装槽;本发明主要用于解决目前在对运动场地材料进行浇注的过程中,由于原料之间产生堆积,从而导致制作的运动场地材料厚度有所差异,同时本发明在制作运动场地材料时添加的水性胶溶液,在原料浇注的过程中原料会发生粘接产生堆积,导致原料在浇注的过程中各部分原料厚度不均匀,从而会使制作的运动场地材料凹凸不平的问题。
Preparation method of pouring type prefabricated polyurethane elastomer sport field material
一种浇注型预制聚氨酯弹性体运动场地材料制备方法
SHI YUJIE (author)
2020-11-03
Patent
Electronic Resource
Chinese
IPC:
C08L
COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
,
Massen auf Basis makromolekularer Verbindungen
/
C08K
Verwendung von anorganischen oder nichtmakromolekularen organischen Stoffen als Zusatzstoffe
,
USE OF INORGANIC OR NON-MACROMOLECULAR ORGANIC SUBSTANCES AS COMPOUNDING INGREDIENTS
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Preparation method of prefabricated pouring type asphalt repairing material
European Patent Office | 2020
|European Patent Office | 2020
|PIER STUD PREFABRICATED POURING SYSTEM, AND OFFSITE POURING METHOD THEREOF
European Patent Office | 2022
|