Soil-restoring seepage-preventing structure
The invention provides a soil-restoring seepage-preventing structure. The soil-restoring seepage-preventing structure comprises a soil-retaining wall and a curtain. According to the soil-restoring seepage-preventing structure, civil engineering construction preparation work is conducted on one side of the soil-retaining wall, and it is guaranteed that laying work is started after the site is levelled. A smooth site is arranged on one side of the soil-retaining wall, concrete pouring is conducted, and a concrete layer is formed. After the concrete layer is air-dried and condenses, composite geo-membranes are arranged on the top of the concrete layer in a laid manner, and a composite geo-membrane layer is formed. After laid arrangement of the composite geo-membrane layer is completed, residue soil is stacked on the top of the composite geo-membrane layer, and a residue soil layer is formed. A sampling port is formed in the side, close to the soil-retaining wall, of the residue soil layer. After the residue soil layer is compacted and filled, a processing layer is arranged on the top of the residual soil layer in a laid manner. A control cabinet is arranged on the side, close to the soil-retaining wall, of the processing layer in the process of being laid. After laying arrangement of the processing layer is completed, a cultivating layer is arranged on the top of the processing layer in a laid manner. A steel frame is fixedly connected to the top of the cultivating layer. A workshop is fixedly connected to the bottom of one portion of the steel frame. According to the soil-restoring seepage-preventing structure, a multi-layer structure is arranged by using different materials, and a seepage-preventing restoring process is guaranteed.
本发明提出了一种土壤修复防渗结构,包括挡土墙和幕布。该种土壤修复防渗结构,挡土墙的一侧进行土木工程施工准备工作,确保场地平整后开始铺设,挡土墙的一侧设置平整场地进行混凝土浇筑形成混凝土层,混凝土层风干凝结后顶部铺设复合土工膜形成复合土工膜层,复合土工膜层铺设完成后于顶部堆放渣土形成渣土层,渣土层靠近挡土墙的一侧开设有取样口,渣土层经过压实充填后于顶部铺设加工层,加工层铺设过程中在其靠近挡土墙的一侧设置控制箱,加工层完成铺设后在其顶部铺设培养层,培养层的顶部固定连接有钢架,钢架的一部分底部固定连接工作间,通过使用不同材料设置多层结构,保证了防渗透的修复过程。
Soil-restoring seepage-preventing structure
The invention provides a soil-restoring seepage-preventing structure. The soil-restoring seepage-preventing structure comprises a soil-retaining wall and a curtain. According to the soil-restoring seepage-preventing structure, civil engineering construction preparation work is conducted on one side of the soil-retaining wall, and it is guaranteed that laying work is started after the site is levelled. A smooth site is arranged on one side of the soil-retaining wall, concrete pouring is conducted, and a concrete layer is formed. After the concrete layer is air-dried and condenses, composite geo-membranes are arranged on the top of the concrete layer in a laid manner, and a composite geo-membrane layer is formed. After laid arrangement of the composite geo-membrane layer is completed, residue soil is stacked on the top of the composite geo-membrane layer, and a residue soil layer is formed. A sampling port is formed in the side, close to the soil-retaining wall, of the residue soil layer. After the residue soil layer is compacted and filled, a processing layer is arranged on the top of the residual soil layer in a laid manner. A control cabinet is arranged on the side, close to the soil-retaining wall, of the processing layer in the process of being laid. After laying arrangement of the processing layer is completed, a cultivating layer is arranged on the top of the processing layer in a laid manner. A steel frame is fixedly connected to the top of the cultivating layer. A workshop is fixedly connected to the bottom of one portion of the steel frame. According to the soil-restoring seepage-preventing structure, a multi-layer structure is arranged by using different materials, and a seepage-preventing restoring process is guaranteed.
本发明提出了一种土壤修复防渗结构,包括挡土墙和幕布。该种土壤修复防渗结构,挡土墙的一侧进行土木工程施工准备工作,确保场地平整后开始铺设,挡土墙的一侧设置平整场地进行混凝土浇筑形成混凝土层,混凝土层风干凝结后顶部铺设复合土工膜形成复合土工膜层,复合土工膜层铺设完成后于顶部堆放渣土形成渣土层,渣土层靠近挡土墙的一侧开设有取样口,渣土层经过压实充填后于顶部铺设加工层,加工层铺设过程中在其靠近挡土墙的一侧设置控制箱,加工层完成铺设后在其顶部铺设培养层,培养层的顶部固定连接有钢架,钢架的一部分底部固定连接工作间,通过使用不同材料设置多层结构,保证了防渗透的修复过程。
Soil-restoring seepage-preventing structure
一种土壤修复防渗结构
SONG QIANG (author) / TONG MIN (author) / ZHAO FEIFEI (author) / LOU JIANBAO (author)
2020-11-20
Patent
Electronic Resource
Chinese
Anti-seepage device and anti-seepage method for preventing soil pollution
European Patent Office | 2022
|Water stopping and seepage preventing structure of aqueduct
European Patent Office | 2024
|