A platform for research: civil engineering, architecture and urbanism
Existing line large cantilever cover beam dismantling device
The invention discloses an existing line large cantilever cover beam dismantling device, and relates to the technical field of dismantling devices. The existing line large cantilever cover beam dismantling device comprises a breaking hammer body, wherein one side of the breaking hammer body is provided with an installation groove, an installation plate is arranged in the installation groove, a hammer core is installed on the installation plate, a plurality of notches are formed in both sides of the installation groove, and first clamping assemblies are arranged in the notches. Through the first clamping assemblies arranged in the notches, the installation plate can be preliminarily positioned and installed, so that the hammer core can be clamped in the breaking hammer body, further fixingof the hammer core by a second clamping assembly is facilitated, an arranged threaded rod can drive clamping blocks to be clamped in a clamping groove of the installation plate, and installation of the hammer core is completed. Therefore, the hammer cores of different types can be conveniently replaced, the hammer cores of different types can be replaced according to different cover beams, and thebreaking effect of the breaking hammer is improved.
本发明公开了一种既有线大悬臂盖梁拆除装置,涉及拆除装置技术领域。本发明包括破碎锤本体,破碎锤本体的一侧开设有安装槽,安装槽的内部设置有安装板,安装板的安装有锤芯;安装槽的两侧均开设有多个槽口,槽口的内部设置有第一夹紧组件。本发明通过在槽口内设置的第一夹紧组件,可以对安装板进行初步的定位安装,从而使锤芯可以卡紧在破碎锤本体内,从而方便了第二夹紧组件对锤芯进行进一步的固定,设置的螺纹杆,可以带动夹块夹紧在安装板的卡槽内,从而完成了对锤芯安装,从而方便了对不同型号的锤芯进行更换,从而可以根据不同的盖梁更换不同型号的锤芯,从而提高了破碎锤的破碎效果。
Existing line large cantilever cover beam dismantling device
The invention discloses an existing line large cantilever cover beam dismantling device, and relates to the technical field of dismantling devices. The existing line large cantilever cover beam dismantling device comprises a breaking hammer body, wherein one side of the breaking hammer body is provided with an installation groove, an installation plate is arranged in the installation groove, a hammer core is installed on the installation plate, a plurality of notches are formed in both sides of the installation groove, and first clamping assemblies are arranged in the notches. Through the first clamping assemblies arranged in the notches, the installation plate can be preliminarily positioned and installed, so that the hammer core can be clamped in the breaking hammer body, further fixingof the hammer core by a second clamping assembly is facilitated, an arranged threaded rod can drive clamping blocks to be clamped in a clamping groove of the installation plate, and installation of the hammer core is completed. Therefore, the hammer cores of different types can be conveniently replaced, the hammer cores of different types can be replaced according to different cover beams, and thebreaking effect of the breaking hammer is improved.
本发明公开了一种既有线大悬臂盖梁拆除装置,涉及拆除装置技术领域。本发明包括破碎锤本体,破碎锤本体的一侧开设有安装槽,安装槽的内部设置有安装板,安装板的安装有锤芯;安装槽的两侧均开设有多个槽口,槽口的内部设置有第一夹紧组件。本发明通过在槽口内设置的第一夹紧组件,可以对安装板进行初步的定位安装,从而使锤芯可以卡紧在破碎锤本体内,从而方便了第二夹紧组件对锤芯进行进一步的固定,设置的螺纹杆,可以带动夹块夹紧在安装板的卡槽内,从而完成了对锤芯安装,从而方便了对不同型号的锤芯进行更换,从而可以根据不同的盖梁更换不同型号的锤芯,从而提高了破碎锤的破碎效果。
Existing line large cantilever cover beam dismantling device
一种既有线大悬臂盖梁拆除装置
GENG ZEKUN (author) / MAO JIE (author) / HE CHEN (author) / LI JIA (author) / SUN BIAO (author)
2020-11-24
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Unbalanced cantilever beam body dismantling construction process
European Patent Office | 2024
|European Patent Office | 2024
|Large cantilever bent cap bottom die dismantling construction method
European Patent Office | 2024
|Device and method for dismantling cast-in-place beam side mold close to existing line Bailey truss
European Patent Office | 2020
|