Novel front fulcrum hanging basket construction process
The invention discloses a novel front fulcrum hanging basket construction process. A front fulcrum hanging basket is divided into a rear hanging basket and a front hanging basket, and the rear hangingbasket and the front hanging basket are installed step by step. The construction process comprises the steps that firstly, a floor stand erecting method is adopted for constructing the rear hanging basket, and pouring construction of a main beam starting section is completed on the basis of the floor stand and the rear hanging basket; and then, a cantilever assembling method is adopted for installing the front hanging basket, and construction is performed on a main beam post-pouring section on the basis of the front hanging basket and the poured main beam initial section. The front fulcrum hanging basket is split into the front part and the rear part and installed step by step, pouring of the main beam starting section is completed by means of an existing supporting structure of the hanging basket while the rear hanging basket is installed, a construction work amount is greatly reduced, and construction cost is decreased.
本发明公开了一种新型前支点挂篮施工工艺,将前支点挂篮分为后挂篮和前挂篮两部分并对其分步安装:先采用搭设落地支架的方法对后挂篮进行施工,并以所述落地支架和后挂篮为基础完成主梁起始段的浇筑施工,再采用悬臂拼装的方法,安装所述前挂篮,以所述前挂篮和已浇筑完成的主梁起始段作为基础对主梁后浇段进行施工。本发明通过将前支点挂篮拆分为前后两部分并对其分步安装,在安装后挂篮的同时借用挂篮的现有支撑结构完成主梁起始段浇筑,大量减少了施工的工程量并降低了施工成本。
Novel front fulcrum hanging basket construction process
The invention discloses a novel front fulcrum hanging basket construction process. A front fulcrum hanging basket is divided into a rear hanging basket and a front hanging basket, and the rear hangingbasket and the front hanging basket are installed step by step. The construction process comprises the steps that firstly, a floor stand erecting method is adopted for constructing the rear hanging basket, and pouring construction of a main beam starting section is completed on the basis of the floor stand and the rear hanging basket; and then, a cantilever assembling method is adopted for installing the front hanging basket, and construction is performed on a main beam post-pouring section on the basis of the front hanging basket and the poured main beam initial section. The front fulcrum hanging basket is split into the front part and the rear part and installed step by step, pouring of the main beam starting section is completed by means of an existing supporting structure of the hanging basket while the rear hanging basket is installed, a construction work amount is greatly reduced, and construction cost is decreased.
本发明公开了一种新型前支点挂篮施工工艺,将前支点挂篮分为后挂篮和前挂篮两部分并对其分步安装:先采用搭设落地支架的方法对后挂篮进行施工,并以所述落地支架和后挂篮为基础完成主梁起始段的浇筑施工,再采用悬臂拼装的方法,安装所述前挂篮,以所述前挂篮和已浇筑完成的主梁起始段作为基础对主梁后浇段进行施工。本发明通过将前支点挂篮拆分为前后两部分并对其分步安装,在安装后挂篮的同时借用挂篮的现有支撑结构完成主梁起始段浇筑,大量减少了施工的工程量并降低了施工成本。
Novel front fulcrum hanging basket construction process
一种新型前支点挂篮施工工艺
HU YIXIN (author) / ZHOU SHU (author) / DAI YUELONG (author) / YAO JIANMIN (author) / MA CAILIANG (author) / BIE YAWEI (author)
2020-11-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Front fulcrum hanging basket and hanging basket walking method
European Patent Office | 2023
|European Patent Office | 2023
|Oversized section front fulcrum hanging basket device for bridge construction
European Patent Office | 2024
|Combined type front fulcrum hanging basket dismantling method
European Patent Office | 2023
|Front fulcrum hanging basket retreating device and retreating method thereof
European Patent Office | 2023
|