A platform for research: civil engineering, architecture and urbanism
Oversized section front fulcrum hanging basket device for bridge construction
The invention discloses an oversized section front fulcrum hanging basket device for bridge construction, and particularly relates to the field of bridge construction, the hanging basket device comprises a main beam section, a main truss is arranged on the main beam section, a guide rail is arranged at the bottom of the main truss, an anchoring mechanism is mounted on the main beam section, and the main truss and the guide rail are fixed on the main beam section through the anchoring mechanism; a hanging basket is arranged at the bottom of one end of the main beam section and used for providing a construction platform. A movable connecting sling is arranged on the guide rail, a roller is arranged in the connecting sling and is in rolling contact with the guide rail, the bottom end of the connecting sling is mounted on the hanging basket, and the connecting sling is used for connecting the main truss and the hanging basket. By arranging the braking mechanism, when the hanging basket moves forwards to the preset position, the hanging basket is braked and stopped through the braking mechanism, the situation that the hanging basket moves by a certain distance more under the action of inertia is avoided, and the problem that the construction precision is affected due to the fact that the hanging basket deviates from the preset accurate position due to extra movement caused by inertia is solved.
本发明公开了一种桥梁施工用超大节段前支点挂篮装置,具体涉及桥梁施工领域,该挂篮装置包括:主梁段,主梁段上设置有主桁架,主桁架的底部设置有导轨,主梁段上安装有锚固机构,主桁架与导轨均通过锚固机构固定在主梁段上,主梁段的一端底部设置有挂篮,挂篮用于提供施工平台;导轨上设置有可移动的联系吊带,联系吊带内设置有滚轮,滚轮与导轨滚动接触,联系吊带的底端安装在挂篮上,联系吊带用于连接主桁架与挂篮。本发明通过设置制动机构,使挂篮在前移至预设位置时,通过制动机构,将挂篮制动停止,避免挂篮在惯性的作用下多运动一段距离,解决了惯性导致的额外移动会使挂篮偏离预设的精确位置,造成影响施工精度的问题。
Oversized section front fulcrum hanging basket device for bridge construction
The invention discloses an oversized section front fulcrum hanging basket device for bridge construction, and particularly relates to the field of bridge construction, the hanging basket device comprises a main beam section, a main truss is arranged on the main beam section, a guide rail is arranged at the bottom of the main truss, an anchoring mechanism is mounted on the main beam section, and the main truss and the guide rail are fixed on the main beam section through the anchoring mechanism; a hanging basket is arranged at the bottom of one end of the main beam section and used for providing a construction platform. A movable connecting sling is arranged on the guide rail, a roller is arranged in the connecting sling and is in rolling contact with the guide rail, the bottom end of the connecting sling is mounted on the hanging basket, and the connecting sling is used for connecting the main truss and the hanging basket. By arranging the braking mechanism, when the hanging basket moves forwards to the preset position, the hanging basket is braked and stopped through the braking mechanism, the situation that the hanging basket moves by a certain distance more under the action of inertia is avoided, and the problem that the construction precision is affected due to the fact that the hanging basket deviates from the preset accurate position due to extra movement caused by inertia is solved.
本发明公开了一种桥梁施工用超大节段前支点挂篮装置,具体涉及桥梁施工领域,该挂篮装置包括:主梁段,主梁段上设置有主桁架,主桁架的底部设置有导轨,主梁段上安装有锚固机构,主桁架与导轨均通过锚固机构固定在主梁段上,主梁段的一端底部设置有挂篮,挂篮用于提供施工平台;导轨上设置有可移动的联系吊带,联系吊带内设置有滚轮,滚轮与导轨滚动接触,联系吊带的底端安装在挂篮上,联系吊带用于连接主桁架与挂篮。本发明通过设置制动机构,使挂篮在前移至预设位置时,通过制动机构,将挂篮制动停止,避免挂篮在惯性的作用下多运动一段距离,解决了惯性导致的额外移动会使挂篮偏离预设的精确位置,造成影响施工精度的问题。
Oversized section front fulcrum hanging basket device for bridge construction
一种桥梁施工用超大节段前支点挂篮装置
YANG XIAOFEI (author) / YI YONG (author) / LUO ZHOU (author) / REN JUAN (author) / WANG LING (author) / GUO SHENG (author) / TANG YU (author) / PENG XUEJUN (author) / LIU YUNLONG (author) / WANG YINGGANG (author)
2024-11-15
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|Front fulcrum hanging basket and hanging basket walking method
European Patent Office | 2023
|Combined type front fulcrum hanging basket dismantling method
European Patent Office | 2023
|European Patent Office | 2023
|