A platform for research: civil engineering, architecture and urbanism
The invention discloses a building prestress absorption combined type connecting inserting pile, and relates to the technical field of building inserting piles. The building prestress absorption combined type connecting inserting pile comprises a connecting alignment plate, a mounting bottom pipe is fixedly connected to the upper portion of the connecting alignment plate, a top mounting pipe seatis fixedly connected to the top of the mounting bottom pipe, a steel bar spiral pipe is fixedly connected to the top of the top mounting pipe seat, the top of the steel bar spiral pipe is fixedly connected with a mounting top pipe seat, reinforcing ribs are arranged on the outer side of the mounting top pipe seat, a butt joint injection pipe body is arranged on the top of the mounting top pipe seat, a butt joint inserting pile is arranged at the bottom of the butt joint injection pipe body, and an adjusting mounting sleeve is arranged on the outer side of the mounting bottom pipe. According tothe building prestress absorption combined type connecting inserting pile, the problems that after concrete is injected into an inserting pile, the stability and prestress bearing of an overall inserting pile keel are frequently too large in stress in the vertical direction, only the outermost side is wrapped with the concrete after the concrete is poured, and the stress bearing effect is commonare solved.
本发明公开了一种建筑预应力吸收组成式连接插桩,包括连接对位板,所述连接对位板上方固定连接有安装底管,所述安装底管顶部固定连接有顶部安装管座,所述顶部安装管座顶部固定连接有钢筋螺旋管,所述钢筋螺旋管顶部固定连接有安装顶管座,所述安装顶管座外侧设置有加强筋,所述安装顶管座顶部设置有对接注入管体,所述对接注入管体底部设置有对接插桩,所述安装底管外侧设置有调节安装套管,本发明涉及建筑插桩技术领域。该建筑预应力吸收组成式连接插桩,解决了插桩注入混凝土之后整体插桩龙骨的稳定性和预应力承受,往往会形成竖直方向的应力过大的情况,并且与混凝土浇筑之后也只是包裹在最外侧,应力承受效果一般的问题。
The invention discloses a building prestress absorption combined type connecting inserting pile, and relates to the technical field of building inserting piles. The building prestress absorption combined type connecting inserting pile comprises a connecting alignment plate, a mounting bottom pipe is fixedly connected to the upper portion of the connecting alignment plate, a top mounting pipe seatis fixedly connected to the top of the mounting bottom pipe, a steel bar spiral pipe is fixedly connected to the top of the top mounting pipe seat, the top of the steel bar spiral pipe is fixedly connected with a mounting top pipe seat, reinforcing ribs are arranged on the outer side of the mounting top pipe seat, a butt joint injection pipe body is arranged on the top of the mounting top pipe seat, a butt joint inserting pile is arranged at the bottom of the butt joint injection pipe body, and an adjusting mounting sleeve is arranged on the outer side of the mounting bottom pipe. According tothe building prestress absorption combined type connecting inserting pile, the problems that after concrete is injected into an inserting pile, the stability and prestress bearing of an overall inserting pile keel are frequently too large in stress in the vertical direction, only the outermost side is wrapped with the concrete after the concrete is poured, and the stress bearing effect is commonare solved.
本发明公开了一种建筑预应力吸收组成式连接插桩,包括连接对位板,所述连接对位板上方固定连接有安装底管,所述安装底管顶部固定连接有顶部安装管座,所述顶部安装管座顶部固定连接有钢筋螺旋管,所述钢筋螺旋管顶部固定连接有安装顶管座,所述安装顶管座外侧设置有加强筋,所述安装顶管座顶部设置有对接注入管体,所述对接注入管体底部设置有对接插桩,所述安装底管外侧设置有调节安装套管,本发明涉及建筑插桩技术领域。该建筑预应力吸收组成式连接插桩,解决了插桩注入混凝土之后整体插桩龙骨的稳定性和预应力承受,往往会形成竖直方向的应力过大的情况,并且与混凝土浇筑之后也只是包裹在最外侧,应力承受效果一般的问题。
Building prestress absorption combined type connecting inserting pile
一种建筑预应力吸收组成式连接插桩
LUO RENFU (author)
2020-12-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Threaded inserting rod type precast pile quick connecting piece
European Patent Office | 2022
|