A platform for research: civil engineering, architecture and urbanism
Power tower construction and installation method
The invention relates to a power electric tower construction and installation method, and relates to the technical field of electric tower construction. Power electric tower construction and installation equipment is used and comprises a workbench, a horizontal device, an adjusting device and a synchronous lifting device. By means of the horizontal device and the adjusting device, the degree of manual intervention in the pre-embedded part installation process is reduced, operation is easy, and the effects of reducing the labor intensity of operators and reducing the working difficulty in the installation process are achieved; a plurality of pre-embedded parts are horizontally clamped and installed at the same height through the horizontal device and the adjusting device, and the effect ofimproving the work efficiency of pre-embedded part installation is achieved; and the equipment is installed and fixed to the ground through the synchronous lifting device, lifting to a certain degreeis achieved, and the effects of improving the automation degree and reducing manual intervention are further achieved.
本发明涉及一种电力电塔施工安装方法,涉及电塔施工的技术领域,其使用了一种电力电塔施工安装设备,该设备包括工作台、水平装置、调节装置以及同步升降装置。本发明通过水平装置与调节装置降低预埋件安装过程人工干预的程度,且容易操作,实现了降低操作人员的劳动强度、安装过程的工作难度的效果;通过与水平装置与调节装置实现在同一高度下对多个预埋件进行水平夹持与安装,实现了提高预埋件安装的工作效率的效果;通过同步升降装置将设备安装固定在地面上,并实现一定的程度上的升降,进一步实现了提高自动化程度、降低人工干预的效果。
Power tower construction and installation method
The invention relates to a power electric tower construction and installation method, and relates to the technical field of electric tower construction. Power electric tower construction and installation equipment is used and comprises a workbench, a horizontal device, an adjusting device and a synchronous lifting device. By means of the horizontal device and the adjusting device, the degree of manual intervention in the pre-embedded part installation process is reduced, operation is easy, and the effects of reducing the labor intensity of operators and reducing the working difficulty in the installation process are achieved; a plurality of pre-embedded parts are horizontally clamped and installed at the same height through the horizontal device and the adjusting device, and the effect ofimproving the work efficiency of pre-embedded part installation is achieved; and the equipment is installed and fixed to the ground through the synchronous lifting device, lifting to a certain degreeis achieved, and the effects of improving the automation degree and reducing manual intervention are further achieved.
本发明涉及一种电力电塔施工安装方法,涉及电塔施工的技术领域,其使用了一种电力电塔施工安装设备,该设备包括工作台、水平装置、调节装置以及同步升降装置。本发明通过水平装置与调节装置降低预埋件安装过程人工干预的程度,且容易操作,实现了降低操作人员的劳动强度、安装过程的工作难度的效果;通过与水平装置与调节装置实现在同一高度下对多个预埋件进行水平夹持与安装,实现了提高预埋件安装的工作效率的效果;通过同步升降装置将设备安装固定在地面上,并实现一定的程度上的升降,进一步实现了提高自动化程度、降低人工干预的效果。
Power tower construction and installation method
一种电力电塔施工安装方法
CHEN ZHIYU (author)
2021-03-12
Patent
Electronic Resource
Chinese
5G communication line tower installation construction method
European Patent Office | 2024
|European Patent Office | 2024
|Installation and construction method of underwater tower crane
European Patent Office | 2023
|