A platform for research: civil engineering, architecture and urbanism
Breaking method for pile head of cast-in-place concrete pile
The invention belongs to the technical field of building pile foundation construction equipment, and particularly relates to a breaking method for a pile head of a cast-in-place concrete pile. According to the breaking method, a pre-machined isolation sleeve (foam pipe) is directly sleeved with a main reinforcement of a reinforcement cage within the range of an invalid pile head, concrete and the main reinforcement of the invalid pile head are not bonded, and the purpose of integrally and rapidly chiseling away the invalid pile head is achieved; and by arranging an isolation assembly, a transition plane with a certain height is formed between the invalid pile head and an effective pile body, holes are formed in the periphery of the pile head, the steps of annularly cutting seams and drilling holes through an instrument are omitted, and the process of generating a fracture surface between the invalid pile head and the effective pile body is more convenient and faster.
本发明属于建筑桩基施工设备技术领域,尤其涉及一种混凝土灌注桩桩头的破除方法。本发明将预先加工好的隔离套管(泡沫管)直接套入无效桩头范围钢筋笼主筋,保证无效桩头混凝土和主筋不发生握裹,实现整体、快速地凿除无效桩头的目的;通过设置隔离组件,在无效桩头和有效桩身之间形成了一定高度的过渡平面,并在桩头的一周形成了孔洞,省去了使用器械环向切缝和钻孔的步骤,使得无效桩头和有效桩身之间产生断面的过程更加便捷。
Breaking method for pile head of cast-in-place concrete pile
The invention belongs to the technical field of building pile foundation construction equipment, and particularly relates to a breaking method for a pile head of a cast-in-place concrete pile. According to the breaking method, a pre-machined isolation sleeve (foam pipe) is directly sleeved with a main reinforcement of a reinforcement cage within the range of an invalid pile head, concrete and the main reinforcement of the invalid pile head are not bonded, and the purpose of integrally and rapidly chiseling away the invalid pile head is achieved; and by arranging an isolation assembly, a transition plane with a certain height is formed between the invalid pile head and an effective pile body, holes are formed in the periphery of the pile head, the steps of annularly cutting seams and drilling holes through an instrument are omitted, and the process of generating a fracture surface between the invalid pile head and the effective pile body is more convenient and faster.
本发明属于建筑桩基施工设备技术领域,尤其涉及一种混凝土灌注桩桩头的破除方法。本发明将预先加工好的隔离套管(泡沫管)直接套入无效桩头范围钢筋笼主筋,保证无效桩头混凝土和主筋不发生握裹,实现整体、快速地凿除无效桩头的目的;通过设置隔离组件,在无效桩头和有效桩身之间形成了一定高度的过渡平面,并在桩头的一周形成了孔洞,省去了使用器械环向切缝和钻孔的步骤,使得无效桩头和有效桩身之间产生断面的过程更加便捷。
Breaking method for pile head of cast-in-place concrete pile
一种混凝土灌注桩桩头的破除方法
HUANG YONGLIANG (author) / ZHOU CHEN (author) / LI ZHONGQIU (author) / YANG YANG (author) / LI LIN (author) / ZHU HAI (author) / LIN HAIBO (author) / HAN LISHU (author) / LIU PENGPENG (author)
2021-05-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pile head breaking method for concrete cast-in-place pile
European Patent Office | 2024
|Cast-in-place concrete pile head separating device and pile head breaking method
European Patent Office | 2022
|Pile head breaking auxiliary device for cast-in-place pile and pile head breaking method
European Patent Office | 2024
|