Wood formwork early-dismantling independent supporting and reinforcing system and construction method thereof
The invention relates to a wood formwork early-dismantling independent supporting and reinforcing system and a construction method thereof. The wood formwork early-dismantling independent supporting and reinforcing system comprises an independent support and a formwork strip arranged on the independent support, wherein a double-spliced square tube is arranged on the independent support, the formwork strip is arranged on the double-spliced square tube, the independent support comprises two sets of seamless steel tubes, an adjustable rod piece and supporting base plates, the adjustable rod piece is arranged between the two sets of seamless steel tubes, the supporting base plates are arranged at the bottoms of the seamless steel tubes, the problems that in the prior art, formwork removal time is too long, formwork circulation is not facilitated, and formwork overstock is serious are solved.
木模早拆独立支撑加固体系及其施工方法,包括独立支撑、设在独立支撑上方的模板条,独立支撑上设双拼方管,模板条设在双拼方管上,独立支撑包括无缝钢管、可调节杆件、支撑垫板,无缝钢管包括两组,可调节杆件设置在两组无缝钢管之间,支撑垫板设在无缝钢管底部,解决现有技术中拆模时间过长,不利于模板的周转,导致模板积压严重的问题。
Wood formwork early-dismantling independent supporting and reinforcing system and construction method thereof
The invention relates to a wood formwork early-dismantling independent supporting and reinforcing system and a construction method thereof. The wood formwork early-dismantling independent supporting and reinforcing system comprises an independent support and a formwork strip arranged on the independent support, wherein a double-spliced square tube is arranged on the independent support, the formwork strip is arranged on the double-spliced square tube, the independent support comprises two sets of seamless steel tubes, an adjustable rod piece and supporting base plates, the adjustable rod piece is arranged between the two sets of seamless steel tubes, the supporting base plates are arranged at the bottoms of the seamless steel tubes, the problems that in the prior art, formwork removal time is too long, formwork circulation is not facilitated, and formwork overstock is serious are solved.
木模早拆独立支撑加固体系及其施工方法,包括独立支撑、设在独立支撑上方的模板条,独立支撑上设双拼方管,模板条设在双拼方管上,独立支撑包括无缝钢管、可调节杆件、支撑垫板,无缝钢管包括两组,可调节杆件设置在两组无缝钢管之间,支撑垫板设在无缝钢管底部,解决现有技术中拆模时间过长,不利于模板的周转,导致模板积压严重的问题。
Wood formwork early-dismantling independent supporting and reinforcing system and construction method thereof
木模早拆独立支撑加固体系及其施工方法
LOU CHENGLONG (author) / WANG BIN (author) / WU YEYANG (author) / PAN XIANXU (author) / LIU YUNQIONG (author)
2021-06-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2022
|Wood formwork early-dismantling formwork erecting system and construction method
European Patent Office | 2024
|European Patent Office | 2023
|