A platform for research: civil engineering, architecture and urbanism
Construction method of ground main body structure of high-speed rail station
The invention provides a construction method of a ground main body structure of a high-speed rail station, and relates to the technical field of main body structure construction of constructional engineering. The construction method comprises the seven steps of first-layer structure layer construction, second-layer structure layer construction, sandwich structure layer construction, top-layer frame structure construction, roof steel structure construction, secondary structure masonry construction and metal roof installation. According to the construction method, various quality problems, such as main body structure cracks, leakage and deflection changes, easily occurring in a normal use state of the ground main body structure of the high-speed rail station in the prior art are solved, the construction period is short, and the comprehensive manufacturing cost is low; according to the construction method, the construction speed can be increased, the labor intensity is relieved, the engineering quality is improved, and the engineering cost is reduced.
本发明提供了一种高铁站的地面主体结构的施工方法,涉及建筑工程的主体结构施工技术领域。本发明所述的施工方法,包括首层结构层施工、二层结构层施工、夹层结构层施工、顶层框架结构施工、屋面钢结构施工、二次结构砌筑施工、金属屋面安装,共七个步骤。本发明的施工方法解决了现有技术中高铁站的地面主体结构在正常使用状态下容易出现的各种质量问题,例如主体结构裂缝、渗漏、挠度变化等,且施工工期短,综合造价低。本发明的施工方法能够加快施工速度,减轻劳动强度,提高工程质量,降低工程成本。
Construction method of ground main body structure of high-speed rail station
The invention provides a construction method of a ground main body structure of a high-speed rail station, and relates to the technical field of main body structure construction of constructional engineering. The construction method comprises the seven steps of first-layer structure layer construction, second-layer structure layer construction, sandwich structure layer construction, top-layer frame structure construction, roof steel structure construction, secondary structure masonry construction and metal roof installation. According to the construction method, various quality problems, such as main body structure cracks, leakage and deflection changes, easily occurring in a normal use state of the ground main body structure of the high-speed rail station in the prior art are solved, the construction period is short, and the comprehensive manufacturing cost is low; according to the construction method, the construction speed can be increased, the labor intensity is relieved, the engineering quality is improved, and the engineering cost is reduced.
本发明提供了一种高铁站的地面主体结构的施工方法,涉及建筑工程的主体结构施工技术领域。本发明所述的施工方法,包括首层结构层施工、二层结构层施工、夹层结构层施工、顶层框架结构施工、屋面钢结构施工、二次结构砌筑施工、金属屋面安装,共七个步骤。本发明的施工方法解决了现有技术中高铁站的地面主体结构在正常使用状态下容易出现的各种质量问题,例如主体结构裂缝、渗漏、挠度变化等,且施工工期短,综合造价低。本发明的施工方法能够加快施工速度,减轻劳动强度,提高工程质量,降低工程成本。
Construction method of ground main body structure of high-speed rail station
一种高铁站的地面主体结构的施工方法
ZHANG SHENGLI (author) / SU WUMING (author) / WANG ZHIBING (author) / GAO QUNSHAN (author) / LIU LIZHUANG (author) / ZHONG CHENG (author) / HE YUNBIAO (author) / WU XUEFENG (author) / LI BING (author) / LIN XIAOYANG (author)
2021-06-25
Patent
Electronic Resource
Chinese
High-speed rail station building main body steel structure construction method
European Patent Office | 2023
|High-speed rail station rail bearing structure and high-speed rail station
European Patent Office | 2021
|Subway station construction main body enclosure structure
European Patent Office | 2023
|