Full hoisting construction method for fabricated subway station in piled anchor enclosure structure system
The invention discloses a full hoisting construction method for a fabricated subway station in a piled anchor enclosure structure system. The method adopts a single gantry crane to achieve the construction method of full hoisting fabricating in the piled anchor enclosure structure system according to the sequence of fine flat strip laying, bottom plate splicing, stand column and longitudinal beam splicing, side wall splicing on two sides, middle plate splicing and top plate splicing. The work efficiency can be greatly improved. The single gantry crane is matched with local assembly trolleys aiming at different components in a foundation pit, so that the investment of the trolleys in the pit is greatly reduced, and the effective operation space in the pit is increased. The problems of traffic jam, serious noise and dust pollution, large labor demand and high material and resource consumption are remarkably improved.
本发明公开了一种桩锚围护结构体系中装配式地铁车站全吊装施工方法,采用单台龙门吊按照铺设精平条带、拼装底板、拼装立柱和纵梁、拼装两边侧墙、拼装中板和拼装顶板顺序实现桩锚围护结构体系中全吊装装配的施工方法,能极大地提高工效;单台龙门吊配合基坑内针对不同构件的局部拼装台车,极大地减少坑中台车投入,增加坑内有效作业空间;本发明针对阻塞交通、噪声粉尘污染严重、劳动力需求量大、材料和资源高消耗的问题都有着十分显著的改善。
Full hoisting construction method for fabricated subway station in piled anchor enclosure structure system
The invention discloses a full hoisting construction method for a fabricated subway station in a piled anchor enclosure structure system. The method adopts a single gantry crane to achieve the construction method of full hoisting fabricating in the piled anchor enclosure structure system according to the sequence of fine flat strip laying, bottom plate splicing, stand column and longitudinal beam splicing, side wall splicing on two sides, middle plate splicing and top plate splicing. The work efficiency can be greatly improved. The single gantry crane is matched with local assembly trolleys aiming at different components in a foundation pit, so that the investment of the trolleys in the pit is greatly reduced, and the effective operation space in the pit is increased. The problems of traffic jam, serious noise and dust pollution, large labor demand and high material and resource consumption are remarkably improved.
本发明公开了一种桩锚围护结构体系中装配式地铁车站全吊装施工方法,采用单台龙门吊按照铺设精平条带、拼装底板、拼装立柱和纵梁、拼装两边侧墙、拼装中板和拼装顶板顺序实现桩锚围护结构体系中全吊装装配的施工方法,能极大地提高工效;单台龙门吊配合基坑内针对不同构件的局部拼装台车,极大地减少坑中台车投入,增加坑内有效作业空间;本发明针对阻塞交通、噪声粉尘污染严重、劳动力需求量大、材料和资源高消耗的问题都有着十分显著的改善。
Full hoisting construction method for fabricated subway station in piled anchor enclosure structure system
桩锚围护结构体系中装配式地铁车站全吊装施工方法
CHEN WENYIN (author) / YU CHENG (author) / LIU HUI (author) / YANG YITAO (author) / WANG KAIFA (author) / ZHU DA (author) / ZHANG YINYIN (author)
2021-08-06
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2022
|Construction method of fabricated subway station and fabricated subway station
European Patent Office | 2024
|Subway station construction main body enclosure structure
European Patent Office | 2023
|