A platform for research: civil engineering, architecture and urbanism
Built-in anchor cable combined uplift pipe pile construction structure and construction method
The invention relates to a built-in anchor cable combined uplift pipe pile construction structure and a construction method. The construction structure comprises a positioning square cylinder, a positioning assembly is arranged in an inner cavity of the positioning square cylinder, the positioning assembly comprises a connecting block and a plurality of preset anchor rods, the ends, close to the positioning square cylinder, of all the preset anchor rods are located in the inner cavity of the positioning square cylinder, the connecting block is used for fixedly connecting all the preset anchor rods, the connecting block and the positioning square cylinder are jointly provided with a fixing assembly, the fixing assembly comprises a fixing column, an end plate, a directional lead screw and a locking nut, a communicating hole is formed in the outer side wall of the positioning square cylinder in a penetrating mode, a side edge groove is formed in the outer side wall of the connecting block, the end plate is arranged at the end, away from the connecting block, of the fixing column, the directional lead screw penetrates through the end plate, and the locking nut is in threaded fit with the outer edge of the directional lead screw. The construction method comprises the steps of installing the assemblies, installing the positioning square cylinder and fixing the positioning square cylinder. The construction structure and the construction method have the effect of effectively improving the uplift strength of the positioning square cylinder relative to the foundation.
本申请涉及一种内置锚索组合抗拔管桩的施工结构及施工方法,施工结构包括定位方筒,所述定位方筒内腔设置有定位组件,所述定位组件包括连接块和多根预设锚杆;所有所述预设锚杆靠近定位方筒的一端位于定位方筒内腔,所述连接块用于固定连接所有预设锚杆;所述连接块与定位方筒共同设置有固定组件,所述固定组件包括固定柱、端部板、定向丝杆和锁止螺母;所述定位方筒外侧壁贯穿设置有通连孔,所述连接块外侧壁设置有侧边槽;所述端部板设置于固定柱远离连接块的一端,所述定向丝杆穿设端部板,所述锁止螺母螺纹配合于定向丝杆外缘。施工方法包括:安装组件、安装定位方筒和固定定位方筒。本申请具有有效提高定位方筒相对地基的抗拔强度的效果。
Built-in anchor cable combined uplift pipe pile construction structure and construction method
The invention relates to a built-in anchor cable combined uplift pipe pile construction structure and a construction method. The construction structure comprises a positioning square cylinder, a positioning assembly is arranged in an inner cavity of the positioning square cylinder, the positioning assembly comprises a connecting block and a plurality of preset anchor rods, the ends, close to the positioning square cylinder, of all the preset anchor rods are located in the inner cavity of the positioning square cylinder, the connecting block is used for fixedly connecting all the preset anchor rods, the connecting block and the positioning square cylinder are jointly provided with a fixing assembly, the fixing assembly comprises a fixing column, an end plate, a directional lead screw and a locking nut, a communicating hole is formed in the outer side wall of the positioning square cylinder in a penetrating mode, a side edge groove is formed in the outer side wall of the connecting block, the end plate is arranged at the end, away from the connecting block, of the fixing column, the directional lead screw penetrates through the end plate, and the locking nut is in threaded fit with the outer edge of the directional lead screw. The construction method comprises the steps of installing the assemblies, installing the positioning square cylinder and fixing the positioning square cylinder. The construction structure and the construction method have the effect of effectively improving the uplift strength of the positioning square cylinder relative to the foundation.
本申请涉及一种内置锚索组合抗拔管桩的施工结构及施工方法,施工结构包括定位方筒,所述定位方筒内腔设置有定位组件,所述定位组件包括连接块和多根预设锚杆;所有所述预设锚杆靠近定位方筒的一端位于定位方筒内腔,所述连接块用于固定连接所有预设锚杆;所述连接块与定位方筒共同设置有固定组件,所述固定组件包括固定柱、端部板、定向丝杆和锁止螺母;所述定位方筒外侧壁贯穿设置有通连孔,所述连接块外侧壁设置有侧边槽;所述端部板设置于固定柱远离连接块的一端,所述定向丝杆穿设端部板,所述锁止螺母螺纹配合于定向丝杆外缘。施工方法包括:安装组件、安装定位方筒和固定定位方筒。本申请具有有效提高定位方筒相对地基的抗拔强度的效果。
Built-in anchor cable combined uplift pipe pile construction structure and construction method
一种内置锚索组合抗拔管桩的施工结构及施工方法
SHI CHI (author) / QIAN JIN (author) / WANG JIANHONG (author) / HONG WEI (author) / QIAN YIXIN (author) / XIAO ZHIZHONG (author)
2021-10-01
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2016
|Construction method of implanted anchor rod type uplift pile
European Patent Office | 2020
|Construction method of stretching type anchor plate uplift pile
European Patent Office | 2024
|