Pipe gallery segment installation construction system and method
The invention provides a pipe gallery segment installation construction system and method. The pipe gallery segment installation construction system comprises a foundation pit, first roads and second roads, wherein the first roads are arranged on the two sides of the foundation pit in the length direction of the foundation pit and used for supporting walking gallery lifting machines, the second roads are arranged on the sides, away from the foundation pit, of the first roads, the second roads are arranged in the length direction of the foundation pit and used for supporting walking gallery conveying vehicles, a third road is arranged between the two first roads, and the third road is arranged in the direction perpendicular to the length direction of the foundation pit and connected with the second roads. According to the pipe gallery segment installation construction system, conveying of the gallery conveying vehicles on the second roads is achieved, gallery lifting and transferring are conducted on the third road in cooperation with movement of the gallery lifting machines on the first roads, the position of the third road can be dismantled and then laid according to actual needs, the transferring and installing construction efficiency of a pipe gallery is improved, and the construction period is shortened.
本发明提供一种管廊节段安装施工系统及方法,该管廊节段安装施工系统包括基坑、第一道路和第二道路,所述基坑的两侧分别沿其长度方向设有所述第一道路,用以支撑行走提廊机,所述第一道路远离所述基坑的一侧设有所述第二道路,所述第二道路沿所述基坑的长度方向设置,用以支撑行走运廊车,两个所述第一道路之间设有第三道路,所述第三道路沿垂直于所述基坑的长度的方向设置,并与所述第二道路连接。本发明实现运廊车在第二道路上运输,并在第三道路上配合提廊机在第一道路上移动进行提廊转运,其中,可根据实际需要拆除再铺设第三道路的位置,提高管廊的转运和安装施工效率,缩短工期。
Pipe gallery segment installation construction system and method
The invention provides a pipe gallery segment installation construction system and method. The pipe gallery segment installation construction system comprises a foundation pit, first roads and second roads, wherein the first roads are arranged on the two sides of the foundation pit in the length direction of the foundation pit and used for supporting walking gallery lifting machines, the second roads are arranged on the sides, away from the foundation pit, of the first roads, the second roads are arranged in the length direction of the foundation pit and used for supporting walking gallery conveying vehicles, a third road is arranged between the two first roads, and the third road is arranged in the direction perpendicular to the length direction of the foundation pit and connected with the second roads. According to the pipe gallery segment installation construction system, conveying of the gallery conveying vehicles on the second roads is achieved, gallery lifting and transferring are conducted on the third road in cooperation with movement of the gallery lifting machines on the first roads, the position of the third road can be dismantled and then laid according to actual needs, the transferring and installing construction efficiency of a pipe gallery is improved, and the construction period is shortened.
本发明提供一种管廊节段安装施工系统及方法,该管廊节段安装施工系统包括基坑、第一道路和第二道路,所述基坑的两侧分别沿其长度方向设有所述第一道路,用以支撑行走提廊机,所述第一道路远离所述基坑的一侧设有所述第二道路,所述第二道路沿所述基坑的长度方向设置,用以支撑行走运廊车,两个所述第一道路之间设有第三道路,所述第三道路沿垂直于所述基坑的长度的方向设置,并与所述第二道路连接。本发明实现运廊车在第二道路上运输,并在第三道路上配合提廊机在第一道路上移动进行提廊转运,其中,可根据实际需要拆除再铺设第三道路的位置,提高管廊的转运和安装施工效率,缩短工期。
Pipe gallery segment installation construction system and method
管廊节段安装施工系统及方法
ZHENG YU (author) / MA HUABING (author) / ZHU LI (author) / SHAN HONGWEI (author) / ZHAO HUANLE (author) / GAO SHIPIN (author)
2021-10-08
Patent
Electronic Resource
Chinese
Pipe gallery prefabricated installation construction method
European Patent Office | 2020
|