Construction method for pipe gallery installation
The invention discloses a construction method for pipe gallery installation. The construction method comprises the steps that before a pipe gallery steel structure is manufactured, the electromechanical pipeline arrangement optimization procedure is added, a cable bridge is arranged on the top layer, a large pipeline is arranged on the second layer or the upper layer of a pipe gallery, the position of a later reserved pipeline is arranged at the adjacent position of the same layer, and the pipe gallery steel structure is designed; the pipe gallery steel structure and the pipeline are constructed in a crossed mode. According to the construction method, the large pipelines are arranged on the two or more layers of the pipe gallery steel structure, the steel consumption of the steel truss can be reduced, a power traction device and a roller device are matched for later-stage pipeline installation, the later-stage pipelines can horizontally move in the pipe gallery, overall horizontal conveying of the later-stage pipelines is achieved, and the construction efficiency is improved. And the later-period pipeline transportation work reserved by the pipe gallery is completed, the later-period pipeline installation efficiency is improved, and the later-period pipeline installation difficulty is reduced.
一种用于管廊安装的施工方法,所述施工方法包括施工方法包括在管廊钢结构制作前、增加机电管线布置优化工序、把电缆桥架布置在顶层、把大型管道布置在管廊的二层及以上层、把后期预留管道的位置设置在同一层的相邻位置、管廊钢结构设计、管廊钢结构与管线采用交叉施工。本发明的施工方法把大型管道布置在管廊钢结构的二层及以上层,可以减少钢桁架的钢材用量,后期管道安装采用动力牵引装置与滚轮装置相配合,使后期管道可以在管廊内进行水平移动,实现后期管道的整体水平输送,完成管廊所预留的后期管道运输工作,提高后期管道的安装效率,降低后期管道安装的难度。
Construction method for pipe gallery installation
The invention discloses a construction method for pipe gallery installation. The construction method comprises the steps that before a pipe gallery steel structure is manufactured, the electromechanical pipeline arrangement optimization procedure is added, a cable bridge is arranged on the top layer, a large pipeline is arranged on the second layer or the upper layer of a pipe gallery, the position of a later reserved pipeline is arranged at the adjacent position of the same layer, and the pipe gallery steel structure is designed; the pipe gallery steel structure and the pipeline are constructed in a crossed mode. According to the construction method, the large pipelines are arranged on the two or more layers of the pipe gallery steel structure, the steel consumption of the steel truss can be reduced, a power traction device and a roller device are matched for later-stage pipeline installation, the later-stage pipelines can horizontally move in the pipe gallery, overall horizontal conveying of the later-stage pipelines is achieved, and the construction efficiency is improved. And the later-period pipeline transportation work reserved by the pipe gallery is completed, the later-period pipeline installation efficiency is improved, and the later-period pipeline installation difficulty is reduced.
一种用于管廊安装的施工方法,所述施工方法包括施工方法包括在管廊钢结构制作前、增加机电管线布置优化工序、把电缆桥架布置在顶层、把大型管道布置在管廊的二层及以上层、把后期预留管道的位置设置在同一层的相邻位置、管廊钢结构设计、管廊钢结构与管线采用交叉施工。本发明的施工方法把大型管道布置在管廊钢结构的二层及以上层,可以减少钢桁架的钢材用量,后期管道安装采用动力牵引装置与滚轮装置相配合,使后期管道可以在管廊内进行水平移动,实现后期管道的整体水平输送,完成管廊所预留的后期管道运输工作,提高后期管道的安装效率,降低后期管道安装的难度。
Construction method for pipe gallery installation
一种用于管廊安装的施工方法
WEI CHENGQUAN (author) / ZHANG GUANGZHI (author) / ZHONG HUISHU (author) / LIN ZIBIN (author) / HUANG ZHIPENG (author) / XIA WENHAO (author) / LI ZEQIANG (author) / HUANG RUIBO (author) / GAN YONGJIAN (author) / CHEN YONGJIE (author)
2024-03-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe gallery prefabricated installation construction method
European Patent Office | 2020
|Pipe gallery segment installation construction system and method
European Patent Office | 2021
|