A platform for research: civil engineering, architecture and urbanism
Pipe gallery segment installation construction system
The invention belongs to the technical field of pipe gallery construction, and particularly relates to a pipe gallery segment installation construction system which comprises the following steps: S1, transportation and hoisting: transporting pipe gallery segments from a manufacturing plant to a construction site, and selecting hoisting equipment according to the weight and size of the pipe gallery segments, S2, butt joint and installation of the segments: according to design requirements, carrying out butt joint and installation on the pipe gallery segments; the pipe gallery sections are in butt joint, welded connection is adopted, the sections are firmly connected together, the structural strength and stability are ensured, weld joint detection is conducted through ultrasonic waves according to specifications, and meanwhile connectors are sealed through waterproof sealant to prevent water vapor from invading. According to the pipe gallery section installation construction system, the two synchronous motors act to drive the driving gears to rotate, so that the driving gears control the meshed driven gears to drive the rotating shafts to rotate, then the rollers and the guide wheels are driven to rotate to achieve advancing, and the pipe gallery sections can be pushed to advance for butt joint.
本发明属于管廊施工技术领域,尤其是一种管廊节段安装施工系统,管廊节段安装施工系统包括如下步骤:S1、运输与吊装:将管廊节段从制造厂运输到施工现场,根据管廊节段的重量和尺寸选择吊装设备,S2、节段对接与安装:根据设计要求,将管廊节段对接在一起,采用焊接连接,将节段牢固连接在一起,确保结构强度和稳定性,并按照规范利用超声波进行焊缝检测,同时利用防水密封胶对接口进行密封处理,防止水汽侵入。该管廊节段安装施工系统,通过两个同步电机动作,即可分别带动主动齿轮转动,使其控制啮合的从动齿轮带动转轴转动,进而带动滚轮与导向轮转动实现前进,则可推动管廊节段前进对接。
Pipe gallery segment installation construction system
The invention belongs to the technical field of pipe gallery construction, and particularly relates to a pipe gallery segment installation construction system which comprises the following steps: S1, transportation and hoisting: transporting pipe gallery segments from a manufacturing plant to a construction site, and selecting hoisting equipment according to the weight and size of the pipe gallery segments, S2, butt joint and installation of the segments: according to design requirements, carrying out butt joint and installation on the pipe gallery segments; the pipe gallery sections are in butt joint, welded connection is adopted, the sections are firmly connected together, the structural strength and stability are ensured, weld joint detection is conducted through ultrasonic waves according to specifications, and meanwhile connectors are sealed through waterproof sealant to prevent water vapor from invading. According to the pipe gallery section installation construction system, the two synchronous motors act to drive the driving gears to rotate, so that the driving gears control the meshed driven gears to drive the rotating shafts to rotate, then the rollers and the guide wheels are driven to rotate to achieve advancing, and the pipe gallery sections can be pushed to advance for butt joint.
本发明属于管廊施工技术领域,尤其是一种管廊节段安装施工系统,管廊节段安装施工系统包括如下步骤:S1、运输与吊装:将管廊节段从制造厂运输到施工现场,根据管廊节段的重量和尺寸选择吊装设备,S2、节段对接与安装:根据设计要求,将管廊节段对接在一起,采用焊接连接,将节段牢固连接在一起,确保结构强度和稳定性,并按照规范利用超声波进行焊缝检测,同时利用防水密封胶对接口进行密封处理,防止水汽侵入。该管廊节段安装施工系统,通过两个同步电机动作,即可分别带动主动齿轮转动,使其控制啮合的从动齿轮带动转轴转动,进而带动滚轮与导向轮转动实现前进,则可推动管廊节段前进对接。
Pipe gallery segment installation construction system
一种管廊节段安装施工系统
SHAN HONGWEI (author) / MA HUABING (author) / ZHU LI (author) / ZHAO HUANLE (author) / GAO SHIPIN (author)
2024-10-11
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pipe gallery segment installation construction system and method
European Patent Office | 2021
|Pipe gallery prefabricated installation construction method
European Patent Office | 2020
|