A platform for research: civil engineering, architecture and urbanism
Reverse construction method steel pipe stand column pile construction sleeve device and construction method thereof
The invention discloses a reverse construction method steel pipe stand column pile construction sleeve device and a construction method thereof. The reverse construction method steel pipe stand column pile construction sleeve device comprises an adjustable steel pipe sleeve and a sleeve supporting platform, the adjustable steel pipe sleeve is arranged on the sleeve supporting platform, position of the stand column pile steel pipe is adjusted by adjusting the sleeve supporting platform and the adjustable steel pipe sleeve. The construction precision of the steel pipe stand column pile can be ensured, the construction progress of the steel pipe stand column pile is accelerated, material and labor input is reduced, the reverse construction method engineering quality is improved, operation is easy, transportation is convenient and fast, site requirement limitation is low, safety is high, and application and popularization of the reverse construction method construction technology are facilitated.
本发明公开了一种逆作法钢管立柱桩施工套管装置及其施工方法,该装置包括可调节钢管套管和套管支撑平台,其中可调节钢管套管设置在套管支撑平台上,套管支撑平台设置在立柱桩开挖孔上,通过调节套管支撑平台及可调节钢管套管来调校立柱桩钢管位置。本发明能够确保钢管立柱桩施工精度,加快钢管立柱桩施工进度,减少材料和劳动力投入,提升逆作法工程质量,操作简单,运输便捷,场地要求限制低,安全性高,有利于逆作法施工技术的推广与应用。
Reverse construction method steel pipe stand column pile construction sleeve device and construction method thereof
The invention discloses a reverse construction method steel pipe stand column pile construction sleeve device and a construction method thereof. The reverse construction method steel pipe stand column pile construction sleeve device comprises an adjustable steel pipe sleeve and a sleeve supporting platform, the adjustable steel pipe sleeve is arranged on the sleeve supporting platform, position of the stand column pile steel pipe is adjusted by adjusting the sleeve supporting platform and the adjustable steel pipe sleeve. The construction precision of the steel pipe stand column pile can be ensured, the construction progress of the steel pipe stand column pile is accelerated, material and labor input is reduced, the reverse construction method engineering quality is improved, operation is easy, transportation is convenient and fast, site requirement limitation is low, safety is high, and application and popularization of the reverse construction method construction technology are facilitated.
本发明公开了一种逆作法钢管立柱桩施工套管装置及其施工方法,该装置包括可调节钢管套管和套管支撑平台,其中可调节钢管套管设置在套管支撑平台上,套管支撑平台设置在立柱桩开挖孔上,通过调节套管支撑平台及可调节钢管套管来调校立柱桩钢管位置。本发明能够确保钢管立柱桩施工精度,加快钢管立柱桩施工进度,减少材料和劳动力投入,提升逆作法工程质量,操作简单,运输便捷,场地要求限制低,安全性高,有利于逆作法施工技术的推广与应用。
Reverse construction method steel pipe stand column pile construction sleeve device and construction method thereof
一种逆作法钢管立柱桩施工套管装置及其施工方法
ZHU HAI (author) / WANG WENJIN (author) / LIN JIAO (author) / YANG JUN (author) / KONG WEITAO (author) / ZHU TAIKANG (author)
2021-11-23
Patent
Electronic Resource
Chinese
Steel tube stand column pile inverse construction casing device and construction method thereof
European Patent Office | 2020
|Construction method applied to reverse construction steel pipe pile, and structure thereof
European Patent Office | 2020
|Stand column construction method in one-column one-pile construction
European Patent Office | 2021
|