A platform for research: civil engineering, architecture and urbanism
Block hoisting construction method for large-span spherical-crown-shaped bolt-sphere joint net rack
The invention discloses a block hoisting construction method for a large-span spherical-crown-shaped bolt-sphere joint net rack. The block hoisting construction method comprises the following steps that net rack components enter a site for acceptance inspection; paying-off and wire inspection on supporting points are carried out; two grid frames at the bottom are spliced into middle splicing units on the ground in a segmented mode; the second circle of net rack is spliced into small splicing units on the ground, the small splicing units are sequentially hoisted for high-altitude bulk packaging, and then the second circle of net rack is folded; the third circle of net rack is assembled and folded according to the same method, and the rest of net racks are assembled in the same way; and the assembled net rack is checked and accepted. According to the construction method, the construction method that the large-span spherical-crown-shaped bolt-sphere joint net rack is assembled on the ground and hoisted in a blocking mode is adopted, the construction period is shortened, and the influence on production can be reduced in the construction process.
本发明公开了大跨度球冠形螺栓球节点网架分块吊装施工方法,包括以下步骤:对网架构件进场进行验收;支承点进行放线、验线;将底部两格网架分段地面拼装成中拼单元;第二圈网架在地面拼成小拼单元,依次吊装进行高空散装,然后将第二圈网架合拢;按照相同的方法拼装合拢第三圈网架,依次类推将剩余网架拼装完成;对拼装好的网架进行验收。本发明采用大跨度球冠形螺栓球节点网架地面拼装、分块吊装的施工方法,不仅缩短了施工工期,而且在施工过程可以减少对生产的影响。
Block hoisting construction method for large-span spherical-crown-shaped bolt-sphere joint net rack
The invention discloses a block hoisting construction method for a large-span spherical-crown-shaped bolt-sphere joint net rack. The block hoisting construction method comprises the following steps that net rack components enter a site for acceptance inspection; paying-off and wire inspection on supporting points are carried out; two grid frames at the bottom are spliced into middle splicing units on the ground in a segmented mode; the second circle of net rack is spliced into small splicing units on the ground, the small splicing units are sequentially hoisted for high-altitude bulk packaging, and then the second circle of net rack is folded; the third circle of net rack is assembled and folded according to the same method, and the rest of net racks are assembled in the same way; and the assembled net rack is checked and accepted. According to the construction method, the construction method that the large-span spherical-crown-shaped bolt-sphere joint net rack is assembled on the ground and hoisted in a blocking mode is adopted, the construction period is shortened, and the influence on production can be reduced in the construction process.
本发明公开了大跨度球冠形螺栓球节点网架分块吊装施工方法,包括以下步骤:对网架构件进场进行验收;支承点进行放线、验线;将底部两格网架分段地面拼装成中拼单元;第二圈网架在地面拼成小拼单元,依次吊装进行高空散装,然后将第二圈网架合拢;按照相同的方法拼装合拢第三圈网架,依次类推将剩余网架拼装完成;对拼装好的网架进行验收。本发明采用大跨度球冠形螺栓球节点网架地面拼装、分块吊装的施工方法,不仅缩短了施工工期,而且在施工过程可以减少对生产的影响。
Block hoisting construction method for large-span spherical-crown-shaped bolt-sphere joint net rack
大跨度球冠形螺栓球节点网架分块吊装施工方法
CHEN SHULI (author) / WANG JIN (author) / SHI CHENXIA (author) / WU HUI (author) / LIU LONGZHONG (author) / ZHANG ZHENJUN (author) / LI ZHAOBO (author) / ZHI XIAOGANG (author) / ZHANG JINPING (author) / WANG JIANGPING (author)
2022-01-28
Patent
Electronic Resource
Chinese
Segmented hoisting construction method for large-span spherical crown-shaped net rack structure
European Patent Office | 2020
|Large-span bolt-sphere net rack gable wall mounting method
European Patent Office | 2023
|Construction method of large-span columnar bolt-sphere joint grid
European Patent Office | 2022
|Layering and sectioning installation method for large-span spherical-crown-shaped net rack structure
European Patent Office | 2020
|Large-span bolt-sphere net rack support in strong wind area and net rack structure
European Patent Office | 2024
|