A platform for research: civil engineering, architecture and urbanism
Hydropower station workshop leakage water comprehensive treatment system method
The invention discloses a hydroelectric power plant leakage water comprehensive treatment system method which comprises the following steps: shoveling and cleaning an original wall decoration layer, investigating, analyzing and drawing wall defects, classifying the defects, treating the leakage water defects, accurately leveling the ground by adopting SD31 self-leveling cement, and after 72 hours of ground cement-based self-leveling construction, carrying out water leakage treatment on the ground by adopting the SD31 self-leveling cement. And then a layer of lithium-based sealing curing agent is coated on the self-leveling surface, so that the ground is brighter, wear-resistant and stain-resistant. Compared with the prior art, the method has the advantages that the hydropower station workshop is systematically treated through the scheme, the treatment effect is good, the operation stability and user experience of the hydropower station workshop are improved, and service and technical guidance are provided for water leakage and disease treatment of large, medium and small hydropower station engineering workshops in the future.
本发明公开了一种水电站厂房渗漏水综合治理系统方法,包括原墙面装饰层的铲除和清理、墙面缺陷的调查分析和绘图、缺陷分类、渗漏水缺陷治理、地面采用SD31自流平水泥进行精准找平,地面水泥基自流平施工后的72小时后,再在自流平表面涂刷一层锂基密封固化剂,使地面更加亮丽,耐磨耐污。本发明与现有技术相比的优点在于:通过本方案对水电站厂房进行系统治理,治理后的效果优良,提高水电站厂房运行稳定性及用户体验,为今后大中小型水电站工程厂房渗漏水及病害治理提供服务和技术引导。
Hydropower station workshop leakage water comprehensive treatment system method
The invention discloses a hydroelectric power plant leakage water comprehensive treatment system method which comprises the following steps: shoveling and cleaning an original wall decoration layer, investigating, analyzing and drawing wall defects, classifying the defects, treating the leakage water defects, accurately leveling the ground by adopting SD31 self-leveling cement, and after 72 hours of ground cement-based self-leveling construction, carrying out water leakage treatment on the ground by adopting the SD31 self-leveling cement. And then a layer of lithium-based sealing curing agent is coated on the self-leveling surface, so that the ground is brighter, wear-resistant and stain-resistant. Compared with the prior art, the method has the advantages that the hydropower station workshop is systematically treated through the scheme, the treatment effect is good, the operation stability and user experience of the hydropower station workshop are improved, and service and technical guidance are provided for water leakage and disease treatment of large, medium and small hydropower station engineering workshops in the future.
本发明公开了一种水电站厂房渗漏水综合治理系统方法,包括原墙面装饰层的铲除和清理、墙面缺陷的调查分析和绘图、缺陷分类、渗漏水缺陷治理、地面采用SD31自流平水泥进行精准找平,地面水泥基自流平施工后的72小时后,再在自流平表面涂刷一层锂基密封固化剂,使地面更加亮丽,耐磨耐污。本发明与现有技术相比的优点在于:通过本方案对水电站厂房进行系统治理,治理后的效果优良,提高水电站厂房运行稳定性及用户体验,为今后大中小型水电站工程厂房渗漏水及病害治理提供服务和技术引导。
Hydropower station workshop leakage water comprehensive treatment system method
一种水电站厂房渗漏水综合治理系统方法
DONG GUOYI (author) / LIU ZHIQIANG (author) / LANG ZHIYIN (author)
2022-04-22
Patent
Electronic Resource
Chinese
Hydrodynamic leakage drainage system for medium-high water head hydropower station
European Patent Office | 2025
|European Patent Office | 2024
|European Patent Office | 2020
|Hydropower station ground workshop superstructure and installation method
European Patent Office | 2025
|Hydropower station workshop cofferdam structure and construction method thereof
European Patent Office | 2022
|