A platform for research: civil engineering, architecture and urbanism
Construction method for Larsen steel sheet pile cofferdam of deepwater rock stratum foundation static pressure pile planting machine
The invention discloses a Larsen steel sheet pile cofferdam construction method of a deep water rock stratum foundation static pressure pile planting machine, and relates to the field of steel sheet pile cofferdam construction of a rock stratum area in a bridge. The method comprises the following steps: 1) welding a guide truss; 2) arranging a limiting device; (3) a static pressure pile planting machine is installed; 4) drilling and digging a stratum in front of the pile; 5) inserting and driving steel sheet piles; (6) folding; and (7) the guide frame is detached, and the cofferdam is completed. The method has the advantages of being high in steel sheet pile construction speed, low in cost, easy and convenient to operate and the like, and can be used in cofferdam projects in deep water areas and rock stratum areas.
本申请公开了一种深水岩层地基静压植桩机拉森钢板桩围堰施工方法,涉及桥梁中岩层区钢板桩围堰施工的领域。该方法包括一下步骤:1)焊接导向桁架;2)设置限位装置;3)安装静压植桩机;4)钻掘桩前地层;5)插打钢板桩;6)合拢;7)拆除导向架,完成围堰。该方法具有钢板桩施工速度快、成本低、操作简便等优点,并且可用于深水区、岩层区的围堰项目中使用。
Construction method for Larsen steel sheet pile cofferdam of deepwater rock stratum foundation static pressure pile planting machine
The invention discloses a Larsen steel sheet pile cofferdam construction method of a deep water rock stratum foundation static pressure pile planting machine, and relates to the field of steel sheet pile cofferdam construction of a rock stratum area in a bridge. The method comprises the following steps: 1) welding a guide truss; 2) arranging a limiting device; (3) a static pressure pile planting machine is installed; 4) drilling and digging a stratum in front of the pile; 5) inserting and driving steel sheet piles; (6) folding; and (7) the guide frame is detached, and the cofferdam is completed. The method has the advantages of being high in steel sheet pile construction speed, low in cost, easy and convenient to operate and the like, and can be used in cofferdam projects in deep water areas and rock stratum areas.
本申请公开了一种深水岩层地基静压植桩机拉森钢板桩围堰施工方法,涉及桥梁中岩层区钢板桩围堰施工的领域。该方法包括一下步骤:1)焊接导向桁架;2)设置限位装置;3)安装静压植桩机;4)钻掘桩前地层;5)插打钢板桩;6)合拢;7)拆除导向架,完成围堰。该方法具有钢板桩施工速度快、成本低、操作简便等优点,并且可用于深水区、岩层区的围堰项目中使用。
Construction method for Larsen steel sheet pile cofferdam of deepwater rock stratum foundation static pressure pile planting machine
一种深水岩层地基静压植桩机拉森钢板桩围堰施工方法
WANG GUANGBO (author) / LIU WEI (author) / YANG KUNXIANG (author)
2022-04-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Larsen steel sheet pile cofferdam and construction method thereof
European Patent Office | 2020
|Larsen steel sheet pile and high-pressure jet grouting pile combined cofferdam construction method
European Patent Office | 2021
|Construction method for Larsen sheet pile cofferdam for foundation pit of Haihe river
European Patent Office | 2015
|Construction method of underwater pile foundation steel sheet pile cofferdam
European Patent Office | 2023
|