The invention relates to a construction method of a widened pile bearing drainage type foam concrete light embankment of an expressway. The construction method comprises the following steps: preparing for construction; widening the embankment and slotting; piling construction of the tubular pile; constructing an L-shaped cast-in-place concrete panel; and backfilling slag and constructing a broken stone hardcore. The construction method has the beneficial effects that the engineering cost can be effectively reduced, the construction speed of the widened embankment of the expressway is high, the drainage effect is good, the reinforcing steel bars are laid and connected with the anchor rods, reliable connection between the widened embankment and an original embankment is guaranteed, sedimentation of the widened embankment is reduced, the construction quality of the widened embankment of the expressway is improved, and the construction period is shortened. Good technical and economic benefits can be obtained when the method is applied to practical engineering; the drainage ditch is semi-prefabricated, one half of the drainage ditch is prefabricated in a factory, the other half of the drainage ditch is made of the reinforced concrete cast-in-place panel, the prefabricated drainage ditch and the lower portion of the reinforced concrete cast-in-place panel are connected in a stepped mode, threaded rods and bolts are pre-embedded through a reinforced concrete cast-in-place panel foundation to be fixed, the upper portion is leveled through concrete, and the construction speed is high.
本发明涉及一种高速公路拓宽桩承排水式泡沫混凝土轻质路堤的施工方法,包括步骤:施工准备;拼宽路堤开槽;管桩的打设施工;L型现浇砼面板的施工;宕渣回填、碎石垫层施工。本发明的有益效果是:本发明能有效降低工程成本,高速公路拓宽路堤施工速度快、排水效果好,且铺设钢筋并与锚杆连接,保证了拓宽路堤与原有路堤的可靠连接,减少了拓宽路堤的沉降,提高了高速公路拓宽路堤的施工质量,应用于实际工程中可取得较好的技术经济效益;本发明在排水沟采用半预制,一半在工厂预制,另一半利用钢筋砼现浇面板,预制排水沟与钢筋砼现浇面板下部采用台阶式连接,通过钢筋砼现浇面板基础预埋螺纹杆螺栓固定,上部采用混凝土找平,施工速度快。
Construction method for widening pile bearing drainage type foam concrete light embankment of expressway
The invention relates to a construction method of a widened pile bearing drainage type foam concrete light embankment of an expressway. The construction method comprises the following steps: preparing for construction; widening the embankment and slotting; piling construction of the tubular pile; constructing an L-shaped cast-in-place concrete panel; and backfilling slag and constructing a broken stone hardcore. The construction method has the beneficial effects that the engineering cost can be effectively reduced, the construction speed of the widened embankment of the expressway is high, the drainage effect is good, the reinforcing steel bars are laid and connected with the anchor rods, reliable connection between the widened embankment and an original embankment is guaranteed, sedimentation of the widened embankment is reduced, the construction quality of the widened embankment of the expressway is improved, and the construction period is shortened. Good technical and economic benefits can be obtained when the method is applied to practical engineering; the drainage ditch is semi-prefabricated, one half of the drainage ditch is prefabricated in a factory, the other half of the drainage ditch is made of the reinforced concrete cast-in-place panel, the prefabricated drainage ditch and the lower portion of the reinforced concrete cast-in-place panel are connected in a stepped mode, threaded rods and bolts are pre-embedded through a reinforced concrete cast-in-place panel foundation to be fixed, the upper portion is leveled through concrete, and the construction speed is high.
本发明涉及一种高速公路拓宽桩承排水式泡沫混凝土轻质路堤的施工方法,包括步骤:施工准备;拼宽路堤开槽;管桩的打设施工;L型现浇砼面板的施工;宕渣回填、碎石垫层施工。本发明的有益效果是:本发明能有效降低工程成本,高速公路拓宽路堤施工速度快、排水效果好,且铺设钢筋并与锚杆连接,保证了拓宽路堤与原有路堤的可靠连接,减少了拓宽路堤的沉降,提高了高速公路拓宽路堤的施工质量,应用于实际工程中可取得较好的技术经济效益;本发明在排水沟采用半预制,一半在工厂预制,另一半利用钢筋砼现浇面板,预制排水沟与钢筋砼现浇面板下部采用台阶式连接,通过钢筋砼现浇面板基础预埋螺纹杆螺栓固定,上部采用混凝土找平,施工速度快。
Construction method for widening pile bearing drainage type foam concrete light embankment of expressway
高速公路拓宽桩承排水式泡沫混凝土轻质路堤的施工方法
SUN KEJIA (author) / YIN BINGJIE (author) / YAO SHIYU (author) / LI YUAN (author) / LANG JIANFEI (author) / WANG ZHONGHAO (author) / SHAN YANGHUA (author) / SU QIANG (author) / LANXIA (author) / MA MUYUAN (author)
2022-05-13
Patent
Electronic Resource
Chinese
Foam light soil widening height highway embankment construction method
European Patent Office | 2021
|Construction method of cast-in-place concrete full-protection foam light soil widening embankment
European Patent Office | 2023
|Construction method of pile casing foam light soil highway embankment
European Patent Office | 2021
|