Pile foundation static load test method adopting construction pile as anchor
The invention discloses a pile foundation static load test method adopting a construction pile as an anchor, and the method comprises the following steps: S1, construction preparation: preparing instruments, meters, data recording books and other test articles for pile foundation static load test so as to be used for process measurement and data recording of the pile foundation static load test, guarantee the accuracy and uniformity of the test, and improve the test efficiency; and S2, a tester arrives at a test site after completing the step S1, installs and debugs the carried instruments and meters, and investigates the faults of the instruments and meters, so that the accuracy of test data is ensured, test errors are reduced, the method is economical and rapid, is much more convenient than a stacking method adopted in the past, is not limited by geographic positions, and is suitable for popularization and application. Before pile foundation concrete is poured, the embedded steel strands are embedded according to the required number and position, when the concrete reaches the age, a crane installs the girder, all the girders can be installed in place within one day, official loading can be conducted in the morning of the next day, and operation is convenient and fast.
本发明公开了一种采用施工桩做锚固进行桩基静载试验方法,该方法包括以下步骤:S1、施工准备,准备用于进行桩基静载试验的仪器、仪表和数据记录簿等试验用品,从而用于桩基静载试验的过程测量和数据记录,保证试验的准确性和统一性,S2、试验人员完成步骤S1后到达试验现场,对携带的仪器和仪表进行安装和调试,排查仪器、仪表故障性,从而保证试验数据的准确性,降低试验误差,本方法,既经济又快捷,比过去所采用的堆载法方便的多,它不受地理位置限定,灌注桩基混凝土前先将预埋钢绞按要求数量和位置埋置好,混凝土到了龄期,吊车把主梁安装上,1天时间就能全部安装到位,第二天上午就可以正式加载,操作便捷。
Pile foundation static load test method adopting construction pile as anchor
The invention discloses a pile foundation static load test method adopting a construction pile as an anchor, and the method comprises the following steps: S1, construction preparation: preparing instruments, meters, data recording books and other test articles for pile foundation static load test so as to be used for process measurement and data recording of the pile foundation static load test, guarantee the accuracy and uniformity of the test, and improve the test efficiency; and S2, a tester arrives at a test site after completing the step S1, installs and debugs the carried instruments and meters, and investigates the faults of the instruments and meters, so that the accuracy of test data is ensured, test errors are reduced, the method is economical and rapid, is much more convenient than a stacking method adopted in the past, is not limited by geographic positions, and is suitable for popularization and application. Before pile foundation concrete is poured, the embedded steel strands are embedded according to the required number and position, when the concrete reaches the age, a crane installs the girder, all the girders can be installed in place within one day, official loading can be conducted in the morning of the next day, and operation is convenient and fast.
本发明公开了一种采用施工桩做锚固进行桩基静载试验方法,该方法包括以下步骤:S1、施工准备,准备用于进行桩基静载试验的仪器、仪表和数据记录簿等试验用品,从而用于桩基静载试验的过程测量和数据记录,保证试验的准确性和统一性,S2、试验人员完成步骤S1后到达试验现场,对携带的仪器和仪表进行安装和调试,排查仪器、仪表故障性,从而保证试验数据的准确性,降低试验误差,本方法,既经济又快捷,比过去所采用的堆载法方便的多,它不受地理位置限定,灌注桩基混凝土前先将预埋钢绞按要求数量和位置埋置好,混凝土到了龄期,吊车把主梁安装上,1天时间就能全部安装到位,第二天上午就可以正式加载,操作便捷。
Pile foundation static load test method adopting construction pile as anchor
一种采用施工桩做锚固进行桩基静载试验方法
KONG TAO (author) / LI FUCAI (author) / WANG KAI (author) / JIANG PENG (author) / LI ZHAO (author)
2022-05-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pile static load test method adopting anchor cable to apply prestress
European Patent Office | 2024
|European Patent Office | 2020
|Pile arranging method for foundation pile static load test
European Patent Office | 2021
|Engineering pile foundation static load detection resistance anchor hoe