A platform for research: civil engineering, architecture and urbanism
Wind power tower drum with anti-seismic function and mounting method
The invention discloses a wind power tower drum with an anti-seismic function and a mounting method, and belongs to the technical field of quick-drying equipment for knitwear production. Two groups of semi-arc-shaped drum bodies are placed and transported to a position where the drum bodies need to be mounted in a stacking and castellated manner through transportation equipment; the two sets of semi-arc-shaped barrels are attached face to face to form a pipe body structure, then the fixing rods penetrate through the side connecting strips to fix the semi-arc-shaped barrels, the two sets of outer batten arc-shaped frames are arranged on the outer sides of the semi-arc-shaped barrels and the outer sides of the side connecting strips in a sleeving mode, and the clamping grooves are clamped to the outer sides of the side connecting strips; the outer batten arc-shaped frame is clamped and fixed to the outer side of the side connecting strip and the outer side of the semi-arc-shaped barrel in the mode that a screw penetrates through the climbing ladder, the hinge supporting rod is unfolded to adjust the fixed side plate to make contact with the ground, then the screw penetrates through the second fixing hole to be fixed, and the screw penetrates through the first fixing hole to fix the bottom semi-arc-shaped base to the ground.
本发明公开了一种具有抗震功能的风电塔筒及安装方法,属于针织品生产速干设备技术领域,通过运输设备将两组半弧形筒体以垛堞的方式放置并运输至需要安装的位置,将两组半弧形筒体面对面贴合构成管体结构然后将固定杆贯穿侧连接条进而将半弧形筒体固定,将两组外条板弧形架套设在半弧形筒体和侧连接条的外侧,使卡槽卡在侧连接条的外侧处,通过螺杆贯穿攀爬梯将外条板弧形架卡固在侧连接条和半弧形筒体的外侧,展开铰接支撑杆将固定侧板调节至与地面接触然后螺杆贯穿第二固定孔进行固定,将螺杆贯穿第一固定孔将底半弧形座固定在地面。
Wind power tower drum with anti-seismic function and mounting method
The invention discloses a wind power tower drum with an anti-seismic function and a mounting method, and belongs to the technical field of quick-drying equipment for knitwear production. Two groups of semi-arc-shaped drum bodies are placed and transported to a position where the drum bodies need to be mounted in a stacking and castellated manner through transportation equipment; the two sets of semi-arc-shaped barrels are attached face to face to form a pipe body structure, then the fixing rods penetrate through the side connecting strips to fix the semi-arc-shaped barrels, the two sets of outer batten arc-shaped frames are arranged on the outer sides of the semi-arc-shaped barrels and the outer sides of the side connecting strips in a sleeving mode, and the clamping grooves are clamped to the outer sides of the side connecting strips; the outer batten arc-shaped frame is clamped and fixed to the outer side of the side connecting strip and the outer side of the semi-arc-shaped barrel in the mode that a screw penetrates through the climbing ladder, the hinge supporting rod is unfolded to adjust the fixed side plate to make contact with the ground, then the screw penetrates through the second fixing hole to be fixed, and the screw penetrates through the first fixing hole to fix the bottom semi-arc-shaped base to the ground.
本发明公开了一种具有抗震功能的风电塔筒及安装方法,属于针织品生产速干设备技术领域,通过运输设备将两组半弧形筒体以垛堞的方式放置并运输至需要安装的位置,将两组半弧形筒体面对面贴合构成管体结构然后将固定杆贯穿侧连接条进而将半弧形筒体固定,将两组外条板弧形架套设在半弧形筒体和侧连接条的外侧,使卡槽卡在侧连接条的外侧处,通过螺杆贯穿攀爬梯将外条板弧形架卡固在侧连接条和半弧形筒体的外侧,展开铰接支撑杆将固定侧板调节至与地面接触然后螺杆贯穿第二固定孔进行固定,将螺杆贯穿第一固定孔将底半弧形座固定在地面。
Wind power tower drum with anti-seismic function and mounting method
一种具有抗震功能的风电塔筒及安装方法
KIM DAL-GEUN (author) / YANG YE (author) / YANG CHAOMENG (author)
2022-07-22
Patent
Electronic Resource
Chinese
Wind power tower, tower drum and construction method of tower drum
European Patent Office | 2023
|Communication tower with anti-seismic function and mounting method thereof
European Patent Office | 2022
|