Construction method for concrete high pier pouring
The invention discloses a construction method for concrete high pier pouring, and belongs to the technical field of constructional engineering structure construction processes. According to the construction method, construction operation is convenient, and the construction safety of constructors can be effectively guaranteed. The construction method comprises the steps of manufacturing and preassembling of the hydraulic light creeping formwork system, erecting of a concrete high pier head section pouring formwork, concrete pouring and pre-burying of a pre-buried supporting assembly of the hydraulic light creeping formwork system. The construction method comprises the following steps: erecting a concrete high pier second section pouring template, pouring concrete, pre-burying a pre-buried supporting assembly, assembling a climbing assembly of the hydraulic light creeping formwork system, the template supporting assembly and a middle operation platform, climbing a concrete high pier third section pouring template, pouring concrete, and assembling remaining parts of the hydraulic light creeping formwork system. The hydraulic light creeping formwork system is dismantled after pouring of the follow-up sections of the concrete high pier is completed.
本发明公开了一种用于混凝土高墩浇筑的施工方法,属于建筑工程结构物施工工艺技术领域。提供一种施工操作较为方便,能有效保证施工人员施工安全的施工方法。所述的施工方法包括液压轻型爬模系统的制作、预装,混凝土高墩首节段浇筑模板支设、混凝土浇筑以及液压轻型爬模系统的预埋支撑组件的预埋,混凝土高墩第二节段浇筑模板支设、混凝土浇筑以及预埋支撑组件的预埋、液压轻型爬模系统的爬升组件、模板支撑组件以及中操作平台的组装,混凝土高墩第三节段浇筑模板的爬升、混凝土浇筑以及液压轻型爬模系统剩余部件的组装,混凝土高墩后续各节段浇筑模板的爬升、混凝土浇筑以及混凝土高墩后续各节段浇筑完成后液压轻型爬模系统的拆除几个步骤。
Construction method for concrete high pier pouring
The invention discloses a construction method for concrete high pier pouring, and belongs to the technical field of constructional engineering structure construction processes. According to the construction method, construction operation is convenient, and the construction safety of constructors can be effectively guaranteed. The construction method comprises the steps of manufacturing and preassembling of the hydraulic light creeping formwork system, erecting of a concrete high pier head section pouring formwork, concrete pouring and pre-burying of a pre-buried supporting assembly of the hydraulic light creeping formwork system. The construction method comprises the following steps: erecting a concrete high pier second section pouring template, pouring concrete, pre-burying a pre-buried supporting assembly, assembling a climbing assembly of the hydraulic light creeping formwork system, the template supporting assembly and a middle operation platform, climbing a concrete high pier third section pouring template, pouring concrete, and assembling remaining parts of the hydraulic light creeping formwork system. The hydraulic light creeping formwork system is dismantled after pouring of the follow-up sections of the concrete high pier is completed.
本发明公开了一种用于混凝土高墩浇筑的施工方法,属于建筑工程结构物施工工艺技术领域。提供一种施工操作较为方便,能有效保证施工人员施工安全的施工方法。所述的施工方法包括液压轻型爬模系统的制作、预装,混凝土高墩首节段浇筑模板支设、混凝土浇筑以及液压轻型爬模系统的预埋支撑组件的预埋,混凝土高墩第二节段浇筑模板支设、混凝土浇筑以及预埋支撑组件的预埋、液压轻型爬模系统的爬升组件、模板支撑组件以及中操作平台的组装,混凝土高墩第三节段浇筑模板的爬升、混凝土浇筑以及液压轻型爬模系统剩余部件的组装,混凝土高墩后续各节段浇筑模板的爬升、混凝土浇筑以及混凝土高墩后续各节段浇筑完成后液压轻型爬模系统的拆除几个步骤。
Construction method for concrete high pier pouring
用于混凝土高墩浇筑的施工方法
GONG QINGFU (author) / YUE WENGANG (author) / SUN HAOLIN (author) / ZHANG SHAN (author) / OU RIDA (author)
2022-08-02
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Pouring construction process for bridge pier through concrete conduit method
European Patent Office | 2020
|Formwork system and method for high pier column pouring construction
European Patent Office | 2023
|