A platform for research: civil engineering, architecture and urbanism
Formwork hanging tool for horizontal post-cast strip construction
The formwork hanging tool for horizontal post-cast strip construction comprises a structural plate, a pouring cavity is formed in the structural plate, detachable hanging rods are fixed to the positions, located on the two sides of the pouring cavity, of the lower side of the structural plate, a formwork is arranged on the lower side of the pouring cavity, and the lower ends of the hanging rods penetrate through the formwork and hang the formwork. A locking mechanism for driving the lifting rod to tension the formwork is fixedly arranged on the lower surface of the formwork and located on one side of the lifting rod, the formwork is lifted through the lifting rod when the horizontal post-cast strip is constructed, meanwhile, the formwork is tensioned through the locking mechanism during lifting, and meanwhile, a pull rod is fixed through an arranged first supporting frame; and the suspended part of the formwork is hoisted and supported through the pull rod, so that hoisting and fixing of the formwork are more convenient, the pull rod and the hoisting rod can be disassembled after construction is completed, pre-embedded steel bars do not need to be cut, and the formwork hoisting tool is more convenient to disassemble.
本发明公开了一种水平后浇带施工用吊模工具,包括结构板,结构板上设置有浇筑腔,且结构板的下侧位于浇筑腔的两侧均固定有可拆卸的吊杆,浇筑腔的下侧设置有模板,吊杆的下端穿过模板并对其进行吊挂,模板的下表面位于吊杆的一侧固定设置有驱动吊杆对模板进行拉紧的锁紧机构,在对水平后浇带进行施工时通过吊杆对模板进行吊装,同时通过锁紧机构对模板进行吊装时的拉紧,同时通过设置的第一支撑架对拉杆的固定,并通过拉杆对模板的悬空部位的吊起支撑,使得模板的吊装固定更加的方便,并且在施工完成后可将拉杆和吊杆进行拆卸无需对预埋的钢筋进行切割,对于吊模工具的拆卸更加的方便。
Formwork hanging tool for horizontal post-cast strip construction
The formwork hanging tool for horizontal post-cast strip construction comprises a structural plate, a pouring cavity is formed in the structural plate, detachable hanging rods are fixed to the positions, located on the two sides of the pouring cavity, of the lower side of the structural plate, a formwork is arranged on the lower side of the pouring cavity, and the lower ends of the hanging rods penetrate through the formwork and hang the formwork. A locking mechanism for driving the lifting rod to tension the formwork is fixedly arranged on the lower surface of the formwork and located on one side of the lifting rod, the formwork is lifted through the lifting rod when the horizontal post-cast strip is constructed, meanwhile, the formwork is tensioned through the locking mechanism during lifting, and meanwhile, a pull rod is fixed through an arranged first supporting frame; and the suspended part of the formwork is hoisted and supported through the pull rod, so that hoisting and fixing of the formwork are more convenient, the pull rod and the hoisting rod can be disassembled after construction is completed, pre-embedded steel bars do not need to be cut, and the formwork hoisting tool is more convenient to disassemble.
本发明公开了一种水平后浇带施工用吊模工具,包括结构板,结构板上设置有浇筑腔,且结构板的下侧位于浇筑腔的两侧均固定有可拆卸的吊杆,浇筑腔的下侧设置有模板,吊杆的下端穿过模板并对其进行吊挂,模板的下表面位于吊杆的一侧固定设置有驱动吊杆对模板进行拉紧的锁紧机构,在对水平后浇带进行施工时通过吊杆对模板进行吊装,同时通过锁紧机构对模板进行吊装时的拉紧,同时通过设置的第一支撑架对拉杆的固定,并通过拉杆对模板的悬空部位的吊起支撑,使得模板的吊装固定更加的方便,并且在施工完成后可将拉杆和吊杆进行拆卸无需对预埋的钢筋进行切割,对于吊模工具的拆卸更加的方便。
Formwork hanging tool for horizontal post-cast strip construction
一种水平后浇带施工用吊模工具
ZHOU YU (author) / ZHOU JUNJUN (author) / LI SHENG (author) / ZHAO JUN (author) / XU LI (author)
2022-11-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Foundation beam post-cast strip hanging formwork construction method
European Patent Office | 2022
|European Patent Office | 2015
|Post-cast strip bottom formwork hanging device and construction method thereof
European Patent Office | 2024
|Post-cast strip beam and slab construction method adopting formwork hanging method
European Patent Office | 2015
|Hanging walking formwork system for concrete floor post-cast strip
European Patent Office | 2023
|