Construction process of foaming composite insulation board with vacuum insulation board
The invention relates to the technical field of building heat preservation, and provides a construction technology of a foaming composite heat preservation plate with a vacuum heat insulation plate. S2, laying a composite insulation board; s3, an outer side formwork is constructed; s4, constructing an inner side template; s5, the inner side formwork and the outer side formwork are fixed; and S6, an inner side structure layer and an outer side protection layer are constructed. According to the construction process provided by the invention, raw materials can be saved to the greatest extent, and the composite insulation board can be prevented from being damaged in other construction processes. By means of the technical scheme, the composite insulation board can meet corresponding building requirements after construction is completed.
本发明涉及建筑保温技术领域,提出了一种带有真空绝热板的发泡复合保温板的施工工艺,包括以下步骤:步骤S1:模拟排版;步骤S2:铺设复合保温板;步骤S3:构筑外侧模板;步骤S4:构筑内侧模板;步骤S5:固定内侧模板和外侧模板;步骤S6:构筑内侧结构层和外侧防护层。本发明提供的施工工艺,不但能最大程度的节约原料,还能避免复合保温板在其他的施工工艺中遭到破坏。通过上述技术方案,以实现这种复合保温板可以在施工完毕后满足对应的建筑要求。
Construction process of foaming composite insulation board with vacuum insulation board
The invention relates to the technical field of building heat preservation, and provides a construction technology of a foaming composite heat preservation plate with a vacuum heat insulation plate. S2, laying a composite insulation board; s3, an outer side formwork is constructed; s4, constructing an inner side template; s5, the inner side formwork and the outer side formwork are fixed; and S6, an inner side structure layer and an outer side protection layer are constructed. According to the construction process provided by the invention, raw materials can be saved to the greatest extent, and the composite insulation board can be prevented from being damaged in other construction processes. By means of the technical scheme, the composite insulation board can meet corresponding building requirements after construction is completed.
本发明涉及建筑保温技术领域,提出了一种带有真空绝热板的发泡复合保温板的施工工艺,包括以下步骤:步骤S1:模拟排版;步骤S2:铺设复合保温板;步骤S3:构筑外侧模板;步骤S4:构筑内侧模板;步骤S5:固定内侧模板和外侧模板;步骤S6:构筑内侧结构层和外侧防护层。本发明提供的施工工艺,不但能最大程度的节约原料,还能避免复合保温板在其他的施工工艺中遭到破坏。通过上述技术方案,以实现这种复合保温板可以在施工完毕后满足对应的建筑要求。
Construction process of foaming composite insulation board with vacuum insulation board
一种带有真空绝热板的发泡复合保温板的施工工艺
WANG XIAOBO (author) / CHEN WEIWU (author) / ZHANG XUEYONG (author) / MA ZHENNAN (author) / YANG JIA (author) / WEI JUN (author) / LIU WEIHONG (author) / LI ZHI (author) / WANG LONG (author) / CHEN LEJI (author)
2022-12-27
Patent
Electronic Resource
Chinese
European Patent Office | 2021
|