A platform for research: civil engineering, architecture and urbanism
Energy support pile system and construction method thereof
The invention provides an energy support pile system which comprises a plurality of energy support piles, a plurality of energy support piles and a plurality of energy support piles, an in-pile heat exchange pipe is arranged in each energy support pile, a pile foundation reinforcement cage is arranged in each energy support pile, and each pile foundation reinforcement cage is provided with a pile side part and a pile end part; the top beam is fixedly connected with the plurality of energy support piles; wherein a water collecting pipe is arranged in the crown beam, a connector pipe is arranged on the water collecting pipe, and the in-pile heat exchange pipe is communicated with the water collecting pipe. The invention further provides a construction method of the energy support pile system. By the adoption of the energy support pile system and the construction method thereof, the technical problem that in the prior art, foundation pit support piles can only serve as temporary structures and cannot be effectively utilized for a long time in geographical heat exchange can be solved.
本发明提供一种能源支护桩系统,包括:多根能源支护桩,每根所述能源支护桩中设置有桩内换热管,所述能源支护桩内设置有桩基钢筋笼,所述桩基钢筋笼具有桩侧部和桩端部;冠梁,所述冠梁与所述多根能源支护桩固定连接;其中,所述冠梁内设置有汇水管,所述汇水管上设有接口管,所述桩内换热管与所述汇水管连通。本发明还提供一种能源支护桩系统的施工方法。采用本发明的能源支护桩系统及其施工方法,能够解决现有技术中基坑支护桩仅能作为临时性的结构、无法在地缘热交换中得到长期有效利用的技术问题的技术问题。
Energy support pile system and construction method thereof
The invention provides an energy support pile system which comprises a plurality of energy support piles, a plurality of energy support piles and a plurality of energy support piles, an in-pile heat exchange pipe is arranged in each energy support pile, a pile foundation reinforcement cage is arranged in each energy support pile, and each pile foundation reinforcement cage is provided with a pile side part and a pile end part; the top beam is fixedly connected with the plurality of energy support piles; wherein a water collecting pipe is arranged in the crown beam, a connector pipe is arranged on the water collecting pipe, and the in-pile heat exchange pipe is communicated with the water collecting pipe. The invention further provides a construction method of the energy support pile system. By the adoption of the energy support pile system and the construction method thereof, the technical problem that in the prior art, foundation pit support piles can only serve as temporary structures and cannot be effectively utilized for a long time in geographical heat exchange can be solved.
本发明提供一种能源支护桩系统,包括:多根能源支护桩,每根所述能源支护桩中设置有桩内换热管,所述能源支护桩内设置有桩基钢筋笼,所述桩基钢筋笼具有桩侧部和桩端部;冠梁,所述冠梁与所述多根能源支护桩固定连接;其中,所述冠梁内设置有汇水管,所述汇水管上设有接口管,所述桩内换热管与所述汇水管连通。本发明还提供一种能源支护桩系统的施工方法。采用本发明的能源支护桩系统及其施工方法,能够解决现有技术中基坑支护桩仅能作为临时性的结构、无法在地缘热交换中得到长期有效利用的技术问题的技术问题。
Energy support pile system and construction method thereof
能源支护桩系统及其施工方法
DU FENGLEI (author) / LIU MINYI (author) / ZHANG QUAN (author) / WANG TAO (author) / ZHANG GUANGZHE (author) / YANG JIN (author)
2023-01-31
Patent
Electronic Resource
Chinese
Energy-saving support pile system and construction method thereof
European Patent Office | 2023
|Support pile, support pile production method and support pile construction method
European Patent Office | 2023
|