A platform for research: civil engineering, architecture and urbanism
Shear wall screw hole cement cone plugging construction device and construction technology
The invention relates to a shear wall screw hole cement cone plugging construction device and technology, and relates to the technical field of shear wall, the shear wall screw hole cement cone plugging construction device comprises a first mounting frame and a second mounting frame, a conveying mechanism is arranged on the first mounting frame and the second mounting frame, and the conveying mechanism comprises a conveying rod which is in threaded connection with the first mounting frame; the conveying seat is arranged on the second mounting frame in a sliding manner; the rotating rod is rotationally arranged on the conveying seat; the connecting assembly is arranged on the rotating rod and the conveying rod; the fixing assembly is arranged on the conveying rod and the rotating rod; and the driving assembly is arranged on the second mounting frame. The first mounting frame and the second mounting frame are connected to the shear wall, the two ends of the cement cone are connected with the rotating rod and the conveying rod together, then the driving assembly is started to drive the cement cone to enter the screw hole to be mounted, then the first mounting frame and the second mounting frame can be taken down, and the plugging efficiency and the plugging effect are improved.
本申请涉及一种剪力墙螺杆洞水泥锥封堵施工装置及施工工艺,涉及剪力墙的技术领域的技术领域,包括第一安装架和第二安装架,第一安装架和第二安装架上设置有输送机构,输送机构包括:输送杆,螺纹连接在第一安装架上;输送座,滑移设置在第二安装架上;转动杆,转动设置在输送座上;连接组件,设置在转动杆和输送杆上;固定组件,设置在输送杆和转动杆上;驱动组件,设置在第二安装架上。本申请通过将第一安装架和第二安装架连接到剪力墙上,且将水泥锥两端与转动杆和输送杆连接在一起,接着驱动组件启动带动水泥锥进入螺杆洞内进行安装,然后即能取下第一安装架和第二安装架,提高了封堵效率和封堵效果。
Shear wall screw hole cement cone plugging construction device and construction technology
The invention relates to a shear wall screw hole cement cone plugging construction device and technology, and relates to the technical field of shear wall, the shear wall screw hole cement cone plugging construction device comprises a first mounting frame and a second mounting frame, a conveying mechanism is arranged on the first mounting frame and the second mounting frame, and the conveying mechanism comprises a conveying rod which is in threaded connection with the first mounting frame; the conveying seat is arranged on the second mounting frame in a sliding manner; the rotating rod is rotationally arranged on the conveying seat; the connecting assembly is arranged on the rotating rod and the conveying rod; the fixing assembly is arranged on the conveying rod and the rotating rod; and the driving assembly is arranged on the second mounting frame. The first mounting frame and the second mounting frame are connected to the shear wall, the two ends of the cement cone are connected with the rotating rod and the conveying rod together, then the driving assembly is started to drive the cement cone to enter the screw hole to be mounted, then the first mounting frame and the second mounting frame can be taken down, and the plugging efficiency and the plugging effect are improved.
本申请涉及一种剪力墙螺杆洞水泥锥封堵施工装置及施工工艺,涉及剪力墙的技术领域的技术领域,包括第一安装架和第二安装架,第一安装架和第二安装架上设置有输送机构,输送机构包括:输送杆,螺纹连接在第一安装架上;输送座,滑移设置在第二安装架上;转动杆,转动设置在输送座上;连接组件,设置在转动杆和输送杆上;固定组件,设置在输送杆和转动杆上;驱动组件,设置在第二安装架上。本申请通过将第一安装架和第二安装架连接到剪力墙上,且将水泥锥两端与转动杆和输送杆连接在一起,接着驱动组件启动带动水泥锥进入螺杆洞内进行安装,然后即能取下第一安装架和第二安装架,提高了封堵效率和封堵效果。
Shear wall screw hole cement cone plugging construction device and construction technology
一种剪力墙螺杆洞水泥锥封堵施工装置及施工工艺
PENG LIN (author) / HUANG JUN (author) / WANG DESHENG (author) / ZHANG YING (author)
2023-03-07
Patent
Electronic Resource
Chinese
Shear wall screw hole cement cone plugging construction process
European Patent Office | 2021
|Shear wall screw hole plugging device and construction method thereof
European Patent Office | 2023
|European Patent Office | 2020
|Concrete wall column screw hole plugging construction method
European Patent Office | 2023
|