Construction method of bubble mixed light soil
The invention discloses a bubble mixed light soil construction method which comprises the following steps: S1, making preparation work in the early stage of construction, putting people, mechanical equipment and materials in place, respectively adding a bubble mixed light soil foaming agent and water into the mechanical equipment through two feeding bins on the mechanical equipment, the bubble mixed light soil foaming agent and the water are quantitatively fed through the quantitative feeding mechanism, and then the bubble mixed light soil foaming agent and the water are mixed through the mixing mechanism on the mechanical equipment; s2, construction measurement: performing construction measurement work before working; meanwhile, the roadbed width corresponding to each stake mark of the design drawing is calculated, and roadbed sidelines are released; relates to the technical field of building construction, through movement of a moving plate, two feeding bins are blocked back and forth, quantitative feeding of a bubble mixed light soil foaming agent and quantitative water feeding are facilitated, the quality of a foam finished product is improved, and later use is facilitated.
本发明公开了气泡混合轻质土施工方法,该方法包括以下步骤:S1、施工前期做好准备工作,人、机械设备、材各项落实到位,通过机械设备上的两个进料仓分别向机械设备中加入气泡混合轻质土发泡剂和水,利用定量下料机构对气泡混合轻质土发泡剂和水进行定量投入,再利用机械设备上的混合机构对气泡混合轻质土发泡剂和水进行混合;S2、施工测量:开工之前做好施工测量工作;同时,计算设计图每一桩号对应的路基宽度,放出路基边线;涉及建筑施工技术领域,本申请通过移动板的运动,实现来回对两个进料仓进行封堵,方便定量的投入气泡混合轻质土发泡剂和方便定量的进水,提高到泡沫成品的质量,便于后期的使用。
Construction method of bubble mixed light soil
The invention discloses a bubble mixed light soil construction method which comprises the following steps: S1, making preparation work in the early stage of construction, putting people, mechanical equipment and materials in place, respectively adding a bubble mixed light soil foaming agent and water into the mechanical equipment through two feeding bins on the mechanical equipment, the bubble mixed light soil foaming agent and the water are quantitatively fed through the quantitative feeding mechanism, and then the bubble mixed light soil foaming agent and the water are mixed through the mixing mechanism on the mechanical equipment; s2, construction measurement: performing construction measurement work before working; meanwhile, the roadbed width corresponding to each stake mark of the design drawing is calculated, and roadbed sidelines are released; relates to the technical field of building construction, through movement of a moving plate, two feeding bins are blocked back and forth, quantitative feeding of a bubble mixed light soil foaming agent and quantitative water feeding are facilitated, the quality of a foam finished product is improved, and later use is facilitated.
本发明公开了气泡混合轻质土施工方法,该方法包括以下步骤:S1、施工前期做好准备工作,人、机械设备、材各项落实到位,通过机械设备上的两个进料仓分别向机械设备中加入气泡混合轻质土发泡剂和水,利用定量下料机构对气泡混合轻质土发泡剂和水进行定量投入,再利用机械设备上的混合机构对气泡混合轻质土发泡剂和水进行混合;S2、施工测量:开工之前做好施工测量工作;同时,计算设计图每一桩号对应的路基宽度,放出路基边线;涉及建筑施工技术领域,本申请通过移动板的运动,实现来回对两个进料仓进行封堵,方便定量的投入气泡混合轻质土发泡剂和方便定量的进水,提高到泡沫成品的质量,便于后期的使用。
Construction method of bubble mixed light soil
气泡混合轻质土施工方法
WU CUNQUAN (author) / CHEN XIAOMAN (author) / CHEN DEQUAN (author) / LIN ZHIJIE (author) / ZHANG BIHAO (author) / TANG CHUNLAI (author) / MAO GUANGZHEN (author) / AI HUI (author) / SUN BIAO (author) / XIAO YIWEN (author)
2023-03-14
Patent
Electronic Resource
Chinese
Construction method of bubble mixed light soil embankment
European Patent Office | 2023
|Construction structure and construction method of bubble mixed light soil retaining wall
European Patent Office | 2022
|