A platform for research: civil engineering, architecture and urbanism
Novel joint rail and rail joint method
The invention discloses a novel joint rail. The novel joint rail comprises a rail body and sleepers. The device has the beneficial effects that the base and the clamping groove which are located between sleepers are adopted, the inner bottom face of the clamping groove abuts against the bottom face of the rail body, the handle screw rod is rotated till the ejector block at one end of the handle screw rod abuts against the side wall of the sleeper, then fixed installation of the clamping groove can be completed, and at the moment, the base bears pressure exerted by the rail body and supporting force exerted by the side wall of the sleeper; in the stable state, a worker can rotate the adjusting bolts located on the two sides of the bottom face of the rail body correspondingly, the adjusting bolts move during rotation and push the joint ends of the rail body to move, and therefore alignment of the rail body is facilitated, alignment of the joint ends of the rail body is facilitated, and later joint is facilitated; the clamping groove and the base can be detached, follow-up continuous use is facilitated, meanwhile, the sleeper is used for fixing the base and the clamping groove, existing facilities are used, the sleeper does not need to be modified, and use is quite convenient and easy.
本发明公开了一种新型接合铁轨,包括铁轨主体和轨枕。有益效果:本发明采用了位于枕木之间的底座和卡槽,卡槽内底面与铁轨主体底面抵接,转动手柄螺杆至手柄螺杆一端的顶块与轨枕侧壁抵接,即可完成对卡槽的固定安装,此时,底座受到铁轨主体的给与的压力和轨枕侧壁给与的支持力,处于稳定状态,工作人员即可分别转动位于铁轨主体底面两侧的调节螺栓,调节螺栓在转动时移动,推动铁轨主体接合端移动,从而便于铁轨主体对齐,便于调节铁轨主体接合端进行对准,便于后期进行接合,铁轨主体接合完毕后,卡槽和底座可拆下,方便后续继续使用,同时,本装置利用了轨枕对底座和卡槽进行固定,利用现有设施,不必对轨枕作出改装,使用非常方便简单。
Novel joint rail and rail joint method
The invention discloses a novel joint rail. The novel joint rail comprises a rail body and sleepers. The device has the beneficial effects that the base and the clamping groove which are located between sleepers are adopted, the inner bottom face of the clamping groove abuts against the bottom face of the rail body, the handle screw rod is rotated till the ejector block at one end of the handle screw rod abuts against the side wall of the sleeper, then fixed installation of the clamping groove can be completed, and at the moment, the base bears pressure exerted by the rail body and supporting force exerted by the side wall of the sleeper; in the stable state, a worker can rotate the adjusting bolts located on the two sides of the bottom face of the rail body correspondingly, the adjusting bolts move during rotation and push the joint ends of the rail body to move, and therefore alignment of the rail body is facilitated, alignment of the joint ends of the rail body is facilitated, and later joint is facilitated; the clamping groove and the base can be detached, follow-up continuous use is facilitated, meanwhile, the sleeper is used for fixing the base and the clamping groove, existing facilities are used, the sleeper does not need to be modified, and use is quite convenient and easy.
本发明公开了一种新型接合铁轨,包括铁轨主体和轨枕。有益效果:本发明采用了位于枕木之间的底座和卡槽,卡槽内底面与铁轨主体底面抵接,转动手柄螺杆至手柄螺杆一端的顶块与轨枕侧壁抵接,即可完成对卡槽的固定安装,此时,底座受到铁轨主体的给与的压力和轨枕侧壁给与的支持力,处于稳定状态,工作人员即可分别转动位于铁轨主体底面两侧的调节螺栓,调节螺栓在转动时移动,推动铁轨主体接合端移动,从而便于铁轨主体对齐,便于调节铁轨主体接合端进行对准,便于后期进行接合,铁轨主体接合完毕后,卡槽和底座可拆下,方便后续继续使用,同时,本装置利用了轨枕对底座和卡槽进行固定,利用现有设施,不必对轨枕作出改装,使用非常方便简单。
Novel joint rail and rail joint method
一种新型接合铁轨及铁轨接合方法
FU JUNLIANG (author) / FU ZHENHENG (author) / FU YINYI (author) / REN SHUANGLI (author)
2023-03-28
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau