A platform for research: civil engineering, architecture and urbanism
Installation and construction method for steel guard timber of inland river ship lock
The invention relates to the technical field of construction of inland ship locks, wharfs and river channels, in particular to an inland ship lock steel handguard installation and construction method, a steel handguard body is clamped and positioned through an embedded positioning component, and the construction method comprises the steps that a steel handguard body structure is manufactured; pre-burying a steel guard wood mounting positioning and reinforcing component; pouring a main body concrete structure; mounting a grout stop strip and a steel handguard body; and a second-stage concrete structure is poured. According to the inland river ship lock steel fender mounting construction method, the steel fender is embedded into the main body concrete through the positioning part and the clamping groove, reinforcing and positioning are achieved, through the groove and the grout stop strip, the mounting precision of the embedded part can be guaranteed, the construction efficiency can be improved, and meanwhile the grout leakage phenomenon during concrete pouring can be effectively prevented.
本发明涉及内河船闸、码头、河道施工技术领域,具体涉及一种内河船闸钢护木安装施工方法,采用预埋定位部件对钢护木本体形成夹持、定位,施工方法包括的步骤有:制作钢护木本体结构;预埋钢护木安装定位及加固部件;浇筑主体混凝土结构;安装止浆条及钢护木本体;浇筑二期混凝土结构。采用本发明的一种内河船闸钢护木安装施工方法,使钢护木通过定位部件及卡槽嵌入到主体混凝土中、实现加固及定位,通过凹槽及止浆条既能保证埋件的安装精度、提高施工效率,同时也能有效防止砼浇筑时出现漏浆现象。
Installation and construction method for steel guard timber of inland river ship lock
The invention relates to the technical field of construction of inland ship locks, wharfs and river channels, in particular to an inland ship lock steel handguard installation and construction method, a steel handguard body is clamped and positioned through an embedded positioning component, and the construction method comprises the steps that a steel handguard body structure is manufactured; pre-burying a steel guard wood mounting positioning and reinforcing component; pouring a main body concrete structure; mounting a grout stop strip and a steel handguard body; and a second-stage concrete structure is poured. According to the inland river ship lock steel fender mounting construction method, the steel fender is embedded into the main body concrete through the positioning part and the clamping groove, reinforcing and positioning are achieved, through the groove and the grout stop strip, the mounting precision of the embedded part can be guaranteed, the construction efficiency can be improved, and meanwhile the grout leakage phenomenon during concrete pouring can be effectively prevented.
本发明涉及内河船闸、码头、河道施工技术领域,具体涉及一种内河船闸钢护木安装施工方法,采用预埋定位部件对钢护木本体形成夹持、定位,施工方法包括的步骤有:制作钢护木本体结构;预埋钢护木安装定位及加固部件;浇筑主体混凝土结构;安装止浆条及钢护木本体;浇筑二期混凝土结构。采用本发明的一种内河船闸钢护木安装施工方法,使钢护木通过定位部件及卡槽嵌入到主体混凝土中、实现加固及定位,通过凹槽及止浆条既能保证埋件的安装精度、提高施工效率,同时也能有效防止砼浇筑时出现漏浆现象。
Installation and construction method for steel guard timber of inland river ship lock
一种内河船闸钢护木安装施工方法
MOU XUEPENG (author) / HAO ZENGHUI (author) / LI HAIBIN (author) / GAO WENHUAN (author) / XU HUIXIN (author) / LIANG KAN (author) / WANG ZHIDONG (author) / XIA KEBING (author) / TAN SHUAI (author) / WANG MINGLIANG (author)
2023-04-04
Patent
Electronic Resource
Chinese
Inland river ship lock bottom plate top layer steel bar supporting device
European Patent Office | 2021
|European Patent Office | 2020
|Vehicle and ship combined transportation inland river bridge installation method and system
European Patent Office | 2023
|