Post-pouring super-strong shrinkage-free grouting material pouring construction process
The invention discloses a post-pouring super-strong shrinkage-free grouting material pouring construction process which comprises the following steps: delimiting a to-be-constructed area according to a construction drawing; the surface of an object in the to-be-constructed area is cleaned; building a template for pouring slurry according to the construction drawing; pre-prepared slurry is poured into the formwork, after the pouring action is stopped, the poured slurry is maintained, according to the maintenance duration, the corresponding time is selected to remove the formwork, and a grouting layer formed through pouring is obtained; and the outer contour of the grouting layer is trimmed, so that pouring construction is completed. According to the application, the actual to-be-constructed area is delimited according to the construction drawing, the surface of an object in the area is cleaned, the template for pouring the slurry is erected according to the construction drawing, and after pouring, the slurry is maintained and subjected to related finishing, so that the completion of pouring construction of the slurry is ensured.
本申请公开了一种后浇超强无收缩灌浆料灌浇施工工艺,该方法包括步骤:按照施工图纸,划定待施工区域;对所述待施工区域内的物体表面进行清洁;根据所述施工图纸,搭设用于灌浇浆料的模板;将预先配制的浆料灌浇至所述模板内,在停止灌浇动作后,对已灌浇的浆料进行保养,根据保养时长,选择对应时间拆除所述模板,得到灌浇成型的灌浆层;对所述灌浆层进行外部轮廓修整,以完成灌浇施工。本申请实现了根据施工图纸,划定出实际的待施工区域,将该区域内的物体表面进行清洁,并根据施工图纸,搭设用于灌浇浆料的模板,在灌浇后,对浆料进行保养以及相关修整,保证浆料的灌浇施工完成。
Post-pouring super-strong shrinkage-free grouting material pouring construction process
The invention discloses a post-pouring super-strong shrinkage-free grouting material pouring construction process which comprises the following steps: delimiting a to-be-constructed area according to a construction drawing; the surface of an object in the to-be-constructed area is cleaned; building a template for pouring slurry according to the construction drawing; pre-prepared slurry is poured into the formwork, after the pouring action is stopped, the poured slurry is maintained, according to the maintenance duration, the corresponding time is selected to remove the formwork, and a grouting layer formed through pouring is obtained; and the outer contour of the grouting layer is trimmed, so that pouring construction is completed. According to the application, the actual to-be-constructed area is delimited according to the construction drawing, the surface of an object in the area is cleaned, the template for pouring the slurry is erected according to the construction drawing, and after pouring, the slurry is maintained and subjected to related finishing, so that the completion of pouring construction of the slurry is ensured.
本申请公开了一种后浇超强无收缩灌浆料灌浇施工工艺,该方法包括步骤:按照施工图纸,划定待施工区域;对所述待施工区域内的物体表面进行清洁;根据所述施工图纸,搭设用于灌浇浆料的模板;将预先配制的浆料灌浇至所述模板内,在停止灌浇动作后,对已灌浇的浆料进行保养,根据保养时长,选择对应时间拆除所述模板,得到灌浇成型的灌浆层;对所述灌浆层进行外部轮廓修整,以完成灌浇施工。本申请实现了根据施工图纸,划定出实际的待施工区域,将该区域内的物体表面进行清洁,并根据施工图纸,搭设用于灌浇浆料的模板,在灌浇后,对浆料进行保养以及相关修整,保证浆料的灌浇施工完成。
Post-pouring super-strong shrinkage-free grouting material pouring construction process
后浇超强无收缩灌浆料灌浇施工工艺
LI HONGQIANG (author) / ZHANG DONGRUI (author) / ZOU JINLONG (author) / ZHAO ABING (author) / CAO BIN (author) / LI KUNYANG (author)
2023-04-14
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2023
|Water-free grouting construction method for fabricated diaphragm wall post-pouring structure
European Patent Office | 2023
|Cast-in place pile post-grouting construction method for pouring construction
European Patent Office | 2015
|Side slope pouring construction process and slope pouring material
European Patent Office | 2021
|