The invention relates to the technical field of underwater construction, and provides an underwater pouring method. The underwater pouring method at least comprises the following steps that according to parameters of a first batch of materials of bottom sealing concrete, the expansion range and thickness of the bottom sealing concrete after pouring of all pouring guide pipes are obtained; the pouring position point of a first pouring guide pipe is determined in a construction water area, and the pouring position point of a second pouring guide pipe is determined in the expansion range of the first pouring guide pipe, so that a bottom opening of the second pouring guide pipe can be completely embedded into poured bottom sealing concrete; wherein the second pouring guide pipe is adjacent to the first pouring guide pipe; and the pouring position points of other pouring guide pipes are determined according to the mode, other pouring guide pipes are correspondingly installed at the pouring position points, and the installed pouring guide pipes are used for pouring. According to the scheme provided by the invention, the pouring quality of the underwater bottom sealing concrete can be ensured.
本申请涉及水下施工的技术领域,本申请所提供的水下浇筑方法。该水下浇筑方法,至少包括以下步骤:根据封底混凝土的首批料的参数,得到各个浇筑导管在浇筑后封底混凝土的扩展范围和厚度;在施工水域中确定第一浇筑导管的浇筑位置点,在所述第一浇筑导管的扩展范围内确定第二浇筑导管的浇筑位置点,使得所述第二浇筑导管的底口能够被完全埋入所浇筑的封底混凝土中;其中,所述第二浇筑导管与第一浇筑导管相邻设置;按照以上方式确定其他浇筑导管的浇筑位置点,并在所述浇筑位置点对应安装其他浇筑导管,利用所安装的浇筑导管进行浇筑。本申请所提供的方案,能够保证水下封底混凝土的浇筑质量。
Underwater pouring method
The invention relates to the technical field of underwater construction, and provides an underwater pouring method. The underwater pouring method at least comprises the following steps that according to parameters of a first batch of materials of bottom sealing concrete, the expansion range and thickness of the bottom sealing concrete after pouring of all pouring guide pipes are obtained; the pouring position point of a first pouring guide pipe is determined in a construction water area, and the pouring position point of a second pouring guide pipe is determined in the expansion range of the first pouring guide pipe, so that a bottom opening of the second pouring guide pipe can be completely embedded into poured bottom sealing concrete; wherein the second pouring guide pipe is adjacent to the first pouring guide pipe; and the pouring position points of other pouring guide pipes are determined according to the mode, other pouring guide pipes are correspondingly installed at the pouring position points, and the installed pouring guide pipes are used for pouring. According to the scheme provided by the invention, the pouring quality of the underwater bottom sealing concrete can be ensured.
本申请涉及水下施工的技术领域,本申请所提供的水下浇筑方法。该水下浇筑方法,至少包括以下步骤:根据封底混凝土的首批料的参数,得到各个浇筑导管在浇筑后封底混凝土的扩展范围和厚度;在施工水域中确定第一浇筑导管的浇筑位置点,在所述第一浇筑导管的扩展范围内确定第二浇筑导管的浇筑位置点,使得所述第二浇筑导管的底口能够被完全埋入所浇筑的封底混凝土中;其中,所述第二浇筑导管与第一浇筑导管相邻设置;按照以上方式确定其他浇筑导管的浇筑位置点,并在所述浇筑位置点对应安装其他浇筑导管,利用所安装的浇筑导管进行浇筑。本申请所提供的方案,能够保证水下封底混凝土的浇筑质量。
Underwater pouring method
水下浇筑方法
WEN DONGCHANG (author) / ZENG KELIN (author) / ZHANG HUAWU (author) / ZENG JUNJIE (author) / HU JISHUANG (author) / ZHANG GUOHAO (author) / LI CHUANWEI (author) / YAO YAN (author)
2023-04-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underwater concrete pouring device and underwater concrete pouring method
European Patent Office | 2024
|Underwater pouring device and pouring construction method of underwater cementing material
European Patent Office | 2024
|Underwater concrete pouring system and pouring method thereof
European Patent Office | 2020
|Underwater pile foundation concrete pouring mold and concrete underwater pouring method thereof
European Patent Office | 2021
|